Application of Cable Erection Method to Construction of Concrete Arch Bridge in Alpine and High Elevation Area

Article Preview

Abstract:

1# bridge traffic engineering of LiangHeKou hydropower station is located in ganzi region in sichuan province. The altitude of main construction areas lies above the 2700m, perennial mean temperature ranges from-4.9 – 7.9°C,extreme low temperature reach-42.9°C,the temperature difference between day and night,which may adversely affect the execution of the precast concrete and cable erection. Based on the fully and deeply analyse and optimal approaches, We solved several key engineering challenges in precast arch box construction, and also provided valuable experiences for similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5101-5104

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Fengshu Shao, Railway Engineering, Vol: 5(2005),P. 17~18.

Google Scholar

[2] Weiqi Mao, Bridge Construction, Vol: s1(2007),P. 18~21.

Google Scholar

[3] Baochun Chen, journal of highway and transportation research and development, Vol: 04(2001),P. 24~28.

Google Scholar

[4] Ming Chen. Shanxi Science & Technology of Communications, Vol: 02 ( 2012),P. 33~35.

Google Scholar

[5] Yuming Qi, Jianshan Tao, Keqiang Wu, Bridge construction, Vol: S2(2007),P. 54~57.

Google Scholar

[6] Gang Li, Heilongjiang Jiaotong keji, Vol: 5(2009) ,P. 113~115.

Google Scholar