Research and Application of the Type about Rapid Prototyping Mold Bag Retaining Wall Applied to Filling Stope Drift Ends
Abstract:
Coal mining and filling connection is very fast in continuous mining and filling working face. How to build airtight walls at ends of filling stope drift efficiently is one of the bottleneck problems, which restricts production improving in continuous mining working face. This paper presented a design idea of the rapid prototyping mold bag wall, analyzed its structure, did much research and finally provided the design. Field application showed that it improved construction efficiency and reduced cost.
Info:
Periodical:
Pages:
1411-1416
Citation:
Online since:
October 2014