An Optimization and Planning Method Research to Determine Power Transmission Capacity of Clustering Wind Farms Accounting Risk

Article Preview

Abstract:

Large-scale wind farms connected into main grid is accompanied by the reducing of the stability, reliability and security of the power system operation. So the risk cost becomes one of the important factors influencing the profit of transmission network expansion planning. This paper adopted the method of clustering wind power transmission. The objective function established in this paper reflecting the comprehensive benefits of transmission project defined the Pline (transmission capacity) as variable. In order to maximize the comprehensive benefits of the transmission project, the influence of transmission constructing cost, the congestion loss probably caused by a low transmission capacity as well as the cost of risk were taken into account. Calculation of risk is a very complex mixed integer nonlinear problem, so we used Monte-Carlo Simulation to solve this question. Example shoes that the proposed method can achieve optimal transmission capacity, transmission project benefit and planning.

You might also be interested in these eBooks

Info:

* - Corresponding Author

[1] Gang Mu, Yang Cui, Gangue Yan. Proceedings of the CSEE, Vol. 31 (2011) pp.15-19 (in Chinese).

Google Scholar

[2] Ning Yang, Fushuan Wen. Proceedings of the CSEE, Vol. 34 (2010) pp.64-67 (in Chinese).

Google Scholar

[3] Tian Kuo, Qiu Liuqing, Zeng, Ming. Proceeding of the CSEE, Vol. 32 (2012) pp.57-64 (in Chinese).

Google Scholar

[4] Yi Wang, Haozhong Cheng, Proceeding of the CSEE, Vol. 28 (2008) pp.132-138 (in Chinese).

Google Scholar

[5] Qiang Sun, Yunzhou Zhang, Xie Li, et al. Vol. 21 (2009) pp.17-21 (in Chinese).

Google Scholar

[6] Yijia Cao, Lihua Cao, Canbing Li. Proceedings of the CSEE, Vol. 34 (2014) pp.138-144 (in Chinese).

Google Scholar

[7] Jianhua Zhang, Bo Zeng, Jun Dong, et al. Proceeding of the CSEE, Vol. 32 (2012) pp.56-64 (in Chinese).

Google Scholar

[8] C.L. T Borges, D. M Falcao, J.C. O Mello, et al. IEEE Trans on Power Systems, Vol. 16 (2001) pp.203-209.

Google Scholar

[9] Baohui Zhang, Liyong Wang, Lunnong Tan, et al. Power System Technology, Vol. 29 (2005) pp.45-49 (in Chinese).

Google Scholar

[10] Lin Cheng, Gang Jiao, Hao Tian. Power System Technology, Vol. 34 (2010) pp.106-110 (in Chinese).

Google Scholar