[1]
V. Molnár, F. Ferenc, J. Krešák, S. Kropuch, P. Peterka, E. Stanová, J. Šaderová, V. Tittel, M. Tomašková, Steel wire ropes, FBERG TU, Košice, 2006. (original in Slovak).
Google Scholar
[2]
J. Sinay, M. Tomková, Risks in operation of steel wire ropes, Transport & Logistics 6 (2004) 49-59.
Google Scholar
[3]
E. Škvareková, The breaking force of steel wire ropes, Bíbor Publisher, Miskolc, (2013).
Google Scholar
[4]
G. Fedorko, E. Stanová, V. Molnár, N. Husáková, S. Kmeť, Computer modelling and finite element analysis of spiral triangular strands, Advances in Engineering Software 73(7) (2014) 11-21.
DOI: 10.1016/j.advengsoft.2014.02.004
Google Scholar
[5]
J. Šaderová, R. Lenort, The service life calculation of crane ropes in metallurgical operations, in: Metal 2013, Brno, Czech Republic, 2013: pp.1-5.
Google Scholar
[6]
J. Krešák, P. Peterka, S. Kropuch, Testing methods of steel wire ropes at the anchor, Acta Montanistica Slovaca 17(3) (2012) 174-178.
Google Scholar
[7]
M. Straka, Distribution logistics in the examples, ES FBERG, Košice, 2012. (original in Slovak).
Google Scholar
[8]
E. Ocelíková Multi-criteria decision making methods, Elfa s. r. o, Košice, 2002. (original in Slovak).
Google Scholar
[9]
M. Straka, Logistics of distribution, How effectively to get product into the market, EPOS, Bratislava, 2013. (original in Slovak).
Google Scholar
[10]
J. Šaderová, Service life evaluation of hoisting rope, Transport & Logistics Special Issue 5 (2008) 380-383. (original in Slovak).
Google Scholar