Study on Seepage Control in Complicated Hydrogeological Conditions on the Right Bank of JinPing-I Hydropower Station
Abstract:
With consideration of the special hydrogeological conditions and layout characteristics of the hydraulic structures, the seepage control measures of dam abutment and underground powerhouse on the right bank of JinPing-I hydropower station is drawn up. Based on the three dimensional finite element analysis of seepage control with dry area virtual flow constant mesh analysis method, the rationality of the seepage control measures of dam abutment and underground powerhouse has been verified and the key factors affecting the effect of seepage have been compared. In combination with the curtain of dam abutment, the curtain of underground powerhouse is reasonable. The results showed that the steel liner of penstock after the curtain is necessary.
Info:
Periodical:
Pages:
132-141
Citation:
Online since:
October 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: