Consumption Schedule Leveling by Implementation of Two-Rate Capacity Payment

Article Preview

Abstract:

In order to ensure consumers' motivation for daily schedule leveling, the article suggests the two-rate capacity payment implementation on the wholesale power energy and capacity market (WPECM) in case of industrial generation growth. Special attention is given to the real power system model research. As follows from results of economic effect calculation, it is profitable for consumers to regulate their consumption. Undoubtedly, the present analysis can't give completely reliable result in the question of the price change in case of two-rate capacity payment implementation. But it becomes possible to achieve a definite result in consumers' motivation growth.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

732-737

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] N.I. Voropay: Distributed generation in electric power systems. Available at: http: /be. convdocs. org/docs/index-35658. html.

Google Scholar

[2] A.F. Dyakov: Small power in Russia. Problems and perspectives (Moscow, 2003), p.128.

Google Scholar

[3] Th. Ackermann, G. Andersson, L. Soder: Distributed Generation: A Definition. Electric Power System Research. Vol. 57 (2001), № 4, pp.135-204.

Google Scholar

[4] A.O. Egorov, S.A. Eroshenko, V.O. Samoylenko, P.V. Kolobov and D.A. Glushkov: Island mode of low capacity generators operation. Advanced Materials Research. Vol. 1008-1009 (2014), pp.426-429.

DOI: 10.4028/www.scientific.net/amr.1008-1009.426

Google Scholar

[5] S.A. Eroshenko, A.A. Karpenko, S.E. Kokin and A.V. Pazderin: Distributed generation scientific problems. Universities proceedings. Energy problems, 2010, Vol 11-12. pp.126-133.

Google Scholar

[6] A.V. Kirpikov, I.L. Kirpikova and V.P. Oboskalov: Strategy load distributed generation plants during the day. (Industrial Energy. 2014, Vol. №4. pp.12-15).

Google Scholar

[7] Information on http: /br. so-ups. ru/Public/MainPageData/BR/IndicatorBR. aspx.

Google Scholar

[8] Appendix №2 to the Treaty of Accession to the Wholesale Market Trading System. Regulations amending the calculation model of the power system. Available at: http: /www. np-sr. ru/regulation/joining/reglaments/index. htm.

Google Scholar

[9] Appendix №3 to the Treaty of Accession to the Wholesale Market Trading System. Regulation updating the computational model. Available at: http: /www. np-sr. ru/regulation/joining/reglaments/index. htm.

Google Scholar

[10] S.E. Kokin, A.V. Pazderin, E.N. Adarichev. Ways of decreasing maximum and equalizing curve of big cities' power demand. 1st International Conference on Sustainable Power Generation and Supply, SUPERGEN '09, 2009. 5347879.

DOI: 10.1109/supergen.2009.5347879

Google Scholar

[11] D.A. Glushkov, A.I. Khalyasmaa. Discharge criterion along the surface of solid dielectricin SF6 under high pressure. Applied Mechanics and Materials. Vol. 1008-1009. 2014, pp.615-619.

DOI: 10.4028/www.scientific.net/amm.548-549.21

Google Scholar

[12] S.A. Eroshenko, K.V. Vinokurov, A.Y. Smolina. Electrical load forecasting. WIT Transactions on Ecology and the Environment 190 Vol. 1. 2014, pp.299-305.

DOI: 10.2495/eq140291

Google Scholar