Improving Technological Processes for Borehole Drilling in Construction Using Vibration Impact

Article Preview

Abstract:

In this article generalized results of the analysis theoretical and experimental research are presented, as well as the data on the wide-scale implementation of vibration technology for drilling boreholes for various construction purposes. Applying various types of vibration or impact vibration onto a pipe extracted from the ground allows significant decreasing of the static force, thus making it possible to avoid using high-power hoisting equipment (cranes or hydraulic hoisting jacks), avoid damaging the pipe in the process, as well as significantly decrease the costs and improve productivity. We present the data on construction processes whose efficiency can be significantly improved by using vibration on some working organs used during drilling boreholes for various construction purposes.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

220-225

Citation:

Online since:

January 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Blekhman, I.I. Teoriia vibratcionnykh protcessov i ustroistv. Vibratcionnaia mekhanika i vibratcionnaia tekhnika [Theory of Vibration Processes and Machinery. Vibration Mechanics and Vibration Machinery] (2013) Ore and Metals, 638 p. (rus).

Google Scholar

[2] Savinov, O.A., Luskin, A. Ya. Vibratcionnyi metod pogruzheniia svai i ego primenenie v stroitelstve [Vibration Method of Pile-Driving and Its Use for Construction Works] (1960) Stroyizdat, 250 p. (rus).

Google Scholar

[3] Rebrik, B.M. Vibratcionnoe burenie skvazhin [Vibration Method for Boreholes Drilling] (1974) Nedra, 190 p. (rus).

Google Scholar

[4] Tseitlin, M.G., Verstov, V.V., Azbel, G.G. Vibratcionnaia tekhnika i tekhnologiia v svainykh i burovykh rabotakh [Vibration Machinery and Technology for Pile-Driving and Drilling Works] (1987) Stroyizdat, 261 p. (rus).

Google Scholar

[5] Verstov, V.V., Gajdo, A.N., Ivanov, Ya.V. Tekhnologiia i kompleksnaia mekhanizatciia shpuntovykh i svainykh rabot [Technology and Complex Mechanization of Dowel and Pile Works] (2012) Lan, 288 p. (rus).

Google Scholar

[6] Gajdo, A., Verstov, V., Judina A. Comparative Efficiency Investigation of Various Types of Dynamic Influences on the Dipped Pile (2013) World Applied Sciences Journal, 23(6), p.817–822.

Google Scholar

[7] Werstow, W.W., Filippov, E.N. Charakteristik des Einbringens von Polymerspundbohlen in den Boden im Vibrationsverfahren (2013) Bauingenieur die richtungweisende Zeitschrift im Bauingenieurwesen, G21613, p.533–539.

Google Scholar

[8] Verstov, V.V., Filippov, E.N. Sposob vibratcionnogo pogruzheniia v grunt polimernogo shpunta i trub [Method for Vibration Submersion of Polymer Rabbet and Pipes into Soil] Patent RF, no. 2517150, 2013. (rus).

Google Scholar

[9] Verstov, V.V., Gajdo, A.N. Issledovanie sravnitelnoi effektivnosti zaglublenie stalnogo shpunta v plotnyi grunt razlichnymi pogruzhaiushchimi mashinami [Research of Comparative Efficiency for Driving Steel Dowels into Compact Soil Using Different Dipping Machinery] (2013).

Google Scholar

[10] Verstov, V.V., Filippov, E.N. Results of research of vibration immersion parameters of the polymeric sheet pile in soil at water management construction (2013) Bulletin of Civil Engineers, 1(36), p.94–101.

Google Scholar