Financial Management Risk Identification and Measurement in UHV Project

Article Preview

Abstract:

Compared with the general power engineering projects, UHV projects have characteristics of large construction scale, wide radius of management, long management chain and many units involved. Therefore, UHV projects have many financial risks which are different from general power projects. Identifying and measuring risks of financial management in the UHV project is of great significance to avoid important financial risks and improve the efficiency of project financial management. After combing the present situation and characteristics of the UHV project financial management, we use the “three whole” to identify UHV project financial risks from an all-around point of view. Then each importance score of the risk is obtained by expert scoring method so as to divide all the risks into 3 groups, significant risks, important risks and commonly risks by clustering analysis, which can provide the basis for optimizing UHV project financial management mode in the future.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

972-976

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ma Peiyu. Study on risk identification and prevention of distribution network operation [d]. North China electric power University, (2011).

Google Scholar

[2] Chen Shaohui, Sun Peng, Zhang Caiqing. Operational risk recognition and evaluation for distribution network [j]. East China Electric Power, 2011, 04: 604-607.

Google Scholar

[3] Ma Tongtao, Li Cunbin, Wang Jianjun. The dynamic risk assessment model for distribution network Running [j]. East China Electric Power, 2014, 06: 1109-1114.

Google Scholar

[4] Chen Xiaojun, He Luya, Sun Yang, Li Jing. ± 500kV General DC ± 800kV UHV DC control and protection system for comparative analysis [j]. East China Electric Power, 2012, 03: 462-466.

Google Scholar

[5] Han Liu, Zhuang Bo, Wang Zhidong. Techno-economic study on the indexes and evaluation method of ultra high voltage power grid [j]. East China Electric Power, 2012, 07: 1099-1103.

Google Scholar

[6] Chen Xilei, Zhou Hao. Xiangjia dam-Shanghai 800kV UHV DC protection [j]. East China Electric Power, 2011, 04: 600-604.

Google Scholar

[7] Yang Di, Zhang Yan, Song Ping. Influence of HVDC on AC/DC power supply reliability [j]. East China Electric Power, 2011, 06: 915-918.

Google Scholar

[8] Niu dongxiao, Li Jianqing, Ma Xiaoyong. Study on evaluation index system in thermal power plant construction project [j]. East China Electric Power, 2010, 09: 1416-1420.

Google Scholar

[9] Lin Liqiong, Chen Shoujun, Tan Zhong Fu. Grid operations of fuzzy fault tree analysis of model risk assessments [j]. East China Electric Power, 2014, 02: 229-235.

Google Scholar