Method of Estimating the Foundation Settlement under Different Working Conditions through Settlement Measurement

Article Preview

Abstract:

In the large-area soft foundation reinforcement project, the loading process is relatively complicated and the preloading load is not consistent with the service load in most cases; thus the conventional settlement curve fitting method cannot nicely predict the post-construction settlement of foundation under the service load. The back analysis method can be used to obtain the calculation parameters, so the settlement and consolidation conditions under various different loads at different time can be calculated and the foundation settlement hereby can be estimated exactly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

527-530

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Gao Zhiyi, Kan Weiming, Gao Chao and Li Lixin. Feedback Calculation Method for Foundation Settlement and Its Application, China Harbour Engineering, 2005(1): 10~12.

Google Scholar

[2] Zhuge Aijun and Liu Aimin, Research on Back Analysis Method for the Calculation of Foundation Settlement, CCCC Tianjin Port Engineering Institute Co., Ltd.

Google Scholar

[3] Engineering Technology of Macao International Airport, Guangdong Science & Technology Press.

Google Scholar