The Conceptual Framework of Design Change Effects in Some Project Delivery Systems

Article Preview

Abstract:

Changes will always occur in project construction and can not be avoided. Many factors can cause changes in the construction project. Most dominant factors of cause of changes in project construction is design change. Design changes will have bad impact on the performance of construction projects, especially the performance of cost and performance time. Many factors can be the cause of design changes. Knowing the factors that cause a design change and knowing its behavior is very important to do. Knowing factor and behavioral of design changes that occur in project construction, and then can be managed properly, it will can be reduce the occurrence of design changes in projects construction. With the reduction of design changes will be able to improve the performance of construction projects, especially at cost and time performance. Construction projects carried out by using a project delivery system. Each project delivery system used will have different contractual relationships, rules, and responsibilities of each party involved. These differences will lead to in the occurrence differences in design change in project construction. Selection of appropriate project delivery system to complete a construction project is needed. The purpose of this paper is to provide a conceptual framework that can be used to determine the behavior, and the effect of design changes on project construction at some project delivery system used.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

114-120

Citation:

Online since:

July 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Alnuaimi, A. S., Taha, R. A., Mohsin, M. Al, & Al-harthi, A. S. Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman. Journal of Construction Engineering and Management, 136(May), 615–622, (2010).

DOI: 10.1061/(asce)co.1943-7862.0000154

Google Scholar

[2] Andi, Winata, S., & Hendarlim, Y. Faktor-faktor Penyebab Rework Pada Pekerjaan Konstruksi. Civil Engineering Dimension, 7(1), 22–29, (2007).

DOI: 10.33395/juripol.v4i1.10966

Google Scholar

[3] Burati Jr., J. L., Farrington, J. J., & Ledbetter, W. B. Causes of Quality Deviations in Design and Construction. Journal of Construction Engineering and Management, 118(1), 34–49, (1992).

DOI: 10.1061/(asce)0733-9364(1992)118:1(34)

Google Scholar

[4] Chang, A. S. T., Shih, J. S., & Choo, Y. S. Reasons and Costs for Design Change During Production. Journal of Engineering Design, 22(4), 275–289. doi: 10. 1080/09544820903425218, (2011).

DOI: 10.1080/09544820903425218

Google Scholar

[5] Chang, A. S. -T. Reasons for Cost and Schedule Increase for Engineering Design Projects. Journal of Management in Engineering, 18(January), 29–36. doi: 10. 1061/(ASCE)0742-597X(2002)18: 1(29), (2002).

DOI: 10.1061/(asce)0742-597x(2002)18:1(29)

Google Scholar

[6] Cox, I. D., Morris, J. P., Rogerson, J. H., & Jared, G. E. A Quantitative Study of Post Contract Award Design Changes in Construction. Construction Management and Economics, 17, 427–429, (1999).

DOI: 10.1080/014461999371358

Google Scholar

[7] Diekmann, B. J. E., & Nelson, M. C. Construction Claim : Frequency and Severity. Journal of Construction Engineering and Management, I(1), 74–81, (1985).

Google Scholar

[8] El-razek, M. E. A., Bassioni, H. A., & Mobarak, A. M. Causes of Delay in Building Construction Projects in Egypt. Journal Construction Engineering and Management, 134(11), 831–842, (2009).

DOI: 10.1061/(asce)0733-9364(2008)134:11(831)

Google Scholar

[9] Fallahnejad, M. H. Delay Causes in Iran Gas Pipeline Projects. International Journal of Project Management, 31(1), 136–146. doi: 10. 1016/j. ijproman. 2012. 06. 003, (2013).

DOI: 10.1016/j.ijproman.2012.06.003

Google Scholar

[10] Hanna, A. S., & Gunduz, M. Impact of Change Orders on Small Labor-Intensive Projects. Journal of Construction Engineering and Management, 130(October), (2004).

DOI: 10.1061/(asce)0733-9364(2004)130:5(726)

Google Scholar

[11] Hsieh, T., Lu, S., & Wu, C. Statistical Analysis of Causes for Change Orders in Metropolitan Public Works. International Journal of Project Management, 22(8), 679–686. doi: 10. 1016/j. ijproman. 2004. 03. 005, (2004).

DOI: 10.1016/j.ijproman.2004.03.005

Google Scholar

[12] Ibbs, C. W., Wong, C. K., & Kwak, Y. H. Project Change Management System. Journal of Management in Engineering, 17(July), 159–165, (2001).

DOI: 10.1061/(asce)0742-597x(2001)17:3(159)

Google Scholar

[13] Ibbs, W. Construction Change: Likelihood, Severity, and Impact on Productivity. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(3), 67–73. doi: 10. 1061/(ASCE)LA. 1943-4170. 0000089, (2011).

DOI: 10.1061/(asce)la.1943-4170.0000089

Google Scholar

[14] Ibbs, W., Nguyen, L. D., & Lee, S. Quantified Impacts of Project Change. Journal of Professional Issue in Engineering Education and Practice, 133(January), 45–52, (2007).

DOI: 10.1061/(asce)1052-3928(2007)133:1(45)

Google Scholar

[15] Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia. Construction Management and Economics, 15, 83–94, (1997).

DOI: 10.1080/014461997373132

Google Scholar

[16] Konchar, M., & Sanvido, V. Comparison of U.S. Project Delivery Systems. Journal of Construction Engineering and Management, 124(December), 435–444, (1998).

DOI: 10.1061/(asce)0733-9364(1998)124:6(435)

Google Scholar

[17] Langston, C. Comparing International Construction Performance. ePublication@bond. Retrieved January 01, 2014, from http: /epublications. bond. edu. au/cgi/viewcontent. cgi?article=1149&context=sustainable_development, (2012).

Google Scholar

[18] Li, Y., & Taylor, T. R. B. The Impact of Design Rework on Construction Project Performance. In The 29th International Conference of the System Dynamics Society (p.1–15). Washington, (2011).

Google Scholar

[19] Love, P. E. D., Edwards, D. J., Watson, H., & Davis, P. Rework in Civil Infrastructure Projects : Determination of Cost Predictors. Journal of Construction Engineering and Management, 136(March), 275–282. doi: 10. 1061/ASCECO. 1943-7862. 0000136, (2010).

DOI: 10.1061/(asce)co.1943-7862.0000136

Google Scholar

[20] Masterman, J. W. E. An Introduction to Building Procurement System (Second Ed. ). London: Spon Press, (2002).

Google Scholar

[21] Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. Assessing the Effects of Construction Delays on MARA Large Projects. In Proceeding of the International Conference on Advanced Science, Engineering and Information Technology 2011 (p.624–629). (2011).

DOI: 10.18517/ijaseit.1.6.125

Google Scholar

[22] Oyewobi, L. O., & Ogunsemi, D. R. Factors Influencing Reworks Occurrence in Construction: A Study of Selected Building Projects in Nigeria. Journal of Building Performance, 1(1), 1–24, (2010).

Google Scholar

[23] Perkins, R. Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, (July), 588–593, (2009).

DOI: 10.1061/(asce)0733-9364(2009)135:7(588)

Google Scholar

[24] Sambasivan, M., & Soon, Y. W. Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, 25(5), 517–526. doi: 10. 1016/j. ijproman. 2006. 11. 007, (2007).

DOI: 10.1016/j.ijproman.2006.11.007

Google Scholar

[25] Sandyavitri, A. Pengendalian Dampak Perubahan Desain Terhadap Waktu dan Biaya Pekerjaan Konstruksi. Jurnal Teknik Sipil, 9(1), 57–70, (2008).

Google Scholar

[26] Shaban, S. S. A. Factors Affecting the Performance of Construction Projects in the Gaza Strip. The Islamic University of Gaza –Palestine, (2008).

Google Scholar

[27] Sun, M., & Meng, X. Taxonomy for Change Causes and Effects in Construction Projects. International Journal of Project Management, 27(6), 560–572. doi: 10. 1016/j. ijproman. 2008. 10. 005, (2009).

DOI: 10.1016/j.ijproman.2008.10.005

Google Scholar

[28] Wu, C., Hsieh, T., & Cheng, W. Statistical Analysis of Causes for Design Change in Highway Construction on Taiwan. International Journal of Project Management, 23(7), 554–563. doi: 10. 1016/j. ijproman. 2004. 07. 010, (2005).

DOI: 10.1016/j.ijproman.2004.07.010

Google Scholar