[1]
Alnuaimi, A. S., Taha, R. A., Mohsin, M. Al, & Al-harthi, A. S. Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman. Journal of Construction Engineering and Management, 136(May), 615–622, (2010).
DOI: 10.1061/(asce)co.1943-7862.0000154
Google Scholar
[2]
Andi, Winata, S., & Hendarlim, Y. Faktor-faktor Penyebab Rework Pada Pekerjaan Konstruksi. Civil Engineering Dimension, 7(1), 22–29, (2007).
DOI: 10.33395/juripol.v4i1.10966
Google Scholar
[3]
Burati Jr., J. L., Farrington, J. J., & Ledbetter, W. B. Causes of Quality Deviations in Design and Construction. Journal of Construction Engineering and Management, 118(1), 34–49, (1992).
DOI: 10.1061/(asce)0733-9364(1992)118:1(34)
Google Scholar
[4]
Chang, A. S. T., Shih, J. S., & Choo, Y. S. Reasons and Costs for Design Change During Production. Journal of Engineering Design, 22(4), 275–289. doi: 10. 1080/09544820903425218, (2011).
DOI: 10.1080/09544820903425218
Google Scholar
[5]
Chang, A. S. -T. Reasons for Cost and Schedule Increase for Engineering Design Projects. Journal of Management in Engineering, 18(January), 29–36. doi: 10. 1061/(ASCE)0742-597X(2002)18: 1(29), (2002).
DOI: 10.1061/(asce)0742-597x(2002)18:1(29)
Google Scholar
[6]
Cox, I. D., Morris, J. P., Rogerson, J. H., & Jared, G. E. A Quantitative Study of Post Contract Award Design Changes in Construction. Construction Management and Economics, 17, 427–429, (1999).
DOI: 10.1080/014461999371358
Google Scholar
[7]
Diekmann, B. J. E., & Nelson, M. C. Construction Claim : Frequency and Severity. Journal of Construction Engineering and Management, I(1), 74–81, (1985).
Google Scholar
[8]
El-razek, M. E. A., Bassioni, H. A., & Mobarak, A. M. Causes of Delay in Building Construction Projects in Egypt. Journal Construction Engineering and Management, 134(11), 831–842, (2009).
DOI: 10.1061/(asce)0733-9364(2008)134:11(831)
Google Scholar
[9]
Fallahnejad, M. H. Delay Causes in Iran Gas Pipeline Projects. International Journal of Project Management, 31(1), 136–146. doi: 10. 1016/j. ijproman. 2012. 06. 003, (2013).
DOI: 10.1016/j.ijproman.2012.06.003
Google Scholar
[10]
Hanna, A. S., & Gunduz, M. Impact of Change Orders on Small Labor-Intensive Projects. Journal of Construction Engineering and Management, 130(October), (2004).
DOI: 10.1061/(asce)0733-9364(2004)130:5(726)
Google Scholar
[11]
Hsieh, T., Lu, S., & Wu, C. Statistical Analysis of Causes for Change Orders in Metropolitan Public Works. International Journal of Project Management, 22(8), 679–686. doi: 10. 1016/j. ijproman. 2004. 03. 005, (2004).
DOI: 10.1016/j.ijproman.2004.03.005
Google Scholar
[12]
Ibbs, C. W., Wong, C. K., & Kwak, Y. H. Project Change Management System. Journal of Management in Engineering, 17(July), 159–165, (2001).
DOI: 10.1061/(asce)0742-597x(2001)17:3(159)
Google Scholar
[13]
Ibbs, W. Construction Change: Likelihood, Severity, and Impact on Productivity. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(3), 67–73. doi: 10. 1061/(ASCE)LA. 1943-4170. 0000089, (2011).
DOI: 10.1061/(asce)la.1943-4170.0000089
Google Scholar
[14]
Ibbs, W., Nguyen, L. D., & Lee, S. Quantified Impacts of Project Change. Journal of Professional Issue in Engineering Education and Practice, 133(January), 45–52, (2007).
DOI: 10.1061/(asce)1052-3928(2007)133:1(45)
Google Scholar
[15]
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia. Construction Management and Economics, 15, 83–94, (1997).
DOI: 10.1080/014461997373132
Google Scholar
[16]
Konchar, M., & Sanvido, V. Comparison of U.S. Project Delivery Systems. Journal of Construction Engineering and Management, 124(December), 435–444, (1998).
DOI: 10.1061/(asce)0733-9364(1998)124:6(435)
Google Scholar
[17]
Langston, C. Comparing International Construction Performance. ePublication@bond. Retrieved January 01, 2014, from http: /epublications. bond. edu. au/cgi/viewcontent. cgi?article=1149&context=sustainable_development, (2012).
Google Scholar
[18]
Li, Y., & Taylor, T. R. B. The Impact of Design Rework on Construction Project Performance. In The 29th International Conference of the System Dynamics Society (p.1–15). Washington, (2011).
Google Scholar
[19]
Love, P. E. D., Edwards, D. J., Watson, H., & Davis, P. Rework in Civil Infrastructure Projects : Determination of Cost Predictors. Journal of Construction Engineering and Management, 136(March), 275–282. doi: 10. 1061/ASCECO. 1943-7862. 0000136, (2010).
DOI: 10.1061/(asce)co.1943-7862.0000136
Google Scholar
[20]
Masterman, J. W. E. An Introduction to Building Procurement System (Second Ed. ). London: Spon Press, (2002).
Google Scholar
[21]
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. Assessing the Effects of Construction Delays on MARA Large Projects. In Proceeding of the International Conference on Advanced Science, Engineering and Information Technology 2011 (p.624–629). (2011).
DOI: 10.18517/ijaseit.1.6.125
Google Scholar
[22]
Oyewobi, L. O., & Ogunsemi, D. R. Factors Influencing Reworks Occurrence in Construction: A Study of Selected Building Projects in Nigeria. Journal of Building Performance, 1(1), 1–24, (2010).
Google Scholar
[23]
Perkins, R. Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, (July), 588–593, (2009).
DOI: 10.1061/(asce)0733-9364(2009)135:7(588)
Google Scholar
[24]
Sambasivan, M., & Soon, Y. W. Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, 25(5), 517–526. doi: 10. 1016/j. ijproman. 2006. 11. 007, (2007).
DOI: 10.1016/j.ijproman.2006.11.007
Google Scholar
[25]
Sandyavitri, A. Pengendalian Dampak Perubahan Desain Terhadap Waktu dan Biaya Pekerjaan Konstruksi. Jurnal Teknik Sipil, 9(1), 57–70, (2008).
Google Scholar
[26]
Shaban, S. S. A. Factors Affecting the Performance of Construction Projects in the Gaza Strip. The Islamic University of Gaza –Palestine, (2008).
Google Scholar
[27]
Sun, M., & Meng, X. Taxonomy for Change Causes and Effects in Construction Projects. International Journal of Project Management, 27(6), 560–572. doi: 10. 1016/j. ijproman. 2008. 10. 005, (2009).
DOI: 10.1016/j.ijproman.2008.10.005
Google Scholar
[28]
Wu, C., Hsieh, T., & Cheng, W. Statistical Analysis of Causes for Design Change in Highway Construction on Taiwan. International Journal of Project Management, 23(7), 554–563. doi: 10. 1016/j. ijproman. 2004. 07. 010, (2005).
DOI: 10.1016/j.ijproman.2004.07.010
Google Scholar