On Modelling of Chosen Activities during a Construction
Abstract:
This work will present the students project, which is being investigated by the authors and which has direct connection with the dissertations of two of them. In their work, the authors deal with the topic of standardization of time and cost estimating in construction industry. The result of the project will be a software application that can model chosen activities during a construction and process and analyse obtained data. The work will introduce activities that have been chosen as the most suitable for examining, and it will be explained why they have been chosen. The work will describe suggested approaches for measuring and calculation of the time spent on individual activities during a construction and for cost estimation. It will also deal with circumstances influencing the duration and there will be explained how useful can be risk analysis when estimating durations of activities. The conclusion will summarize results of the work and it will outline future development and planned progress.
Info:
Periodical:
Pages:
91-98
Citation:
Online since:
October 2015
Authors:
Price:
Сopyright:
© 2015 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: