Pipe Transmission Project Planning Using What If Analysis Method

Article Preview

Abstract:

In order to succeed Indonesia’s mission to provide 23.000 MegaWatt, the gas pipeline transmission has been built. The Project consists of many activities that related to each other, If one of the activities are having a problem that caused a delay, then the succeeding activities will get affected and could cause a project’s delay. To anticipate, it needs the acceleration of the project’s activity. In this case, the pipe transmission project would cause a 7 day delay. To accelerate it, this study gives the calculation, using “What If Analysis Method” on “Critical Path Method”. The acceleration actions are treated in accordance with providing extra working hours and the certain amount of manpower in the succeeding activities.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

296-301

Citation:

Online since:

January 2017

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2017 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Soegiono. 2006. PipaLaut. Surabaya. Airlangga University Press.

Google Scholar

[2] Soeharto, Iman. 1997. Manajemen Proyek dari Konseptual sampai Operasional. Jakarta. Erlangga.

Google Scholar

[3] Husen, Abrar. 2009. ManajemenProyek. Yogyakarta. PenerbitAndi Yogyakarta.

Google Scholar

[4] Kraiem, Z.K. and Dickmann, J.E. 1987. Concurrent Delays in Construction Projects. Journal of Construction Engineering and Management, ASCE, vol. 113, no. 4, pp.591-602.

DOI: 10.1061/(asce)0733-9364(1987)113:4(591)

Google Scholar

[5] Maranresy, SompiedanPratasis. 2015. Sistem Pengendalian Waktu Pada PekerjaanKonstruksi Jalan Raya Dengan MenggunakanMetode CPM. Jurnal Sipil Statik Vol. 3 No. 1 (8-15) ISSN: 2337-6732.

Google Scholar

[6] Patilang, Sabryagus. 2009. Analisa What If Sebagai Metode Antisipasi Keterlambatan Durasi Proyek Pada Proyek Pembangunan Hotel Abadi Yogyakarta. Tugas Akhir FakultasTeknik Universitas Atma Jaya Yogyakarta.

Google Scholar

[7] Alifen, Setiawan, dan Sunarto. 1999. Analisa What If, Sebagai Metode Antisipasi Keterlambatan Durasi Proyek. DimensiTeknikSipil Vol. 2 No. 1. Surabaya.

Google Scholar