Construction Monitoring on Steel Truss Bridge’s Maintenance and Reinforcement

Article Preview

Abstract:

Implementing monitoring over construction process of old bridge’s reinforcement serves as an important measure to ensure construction quality and safety and realize the goal of reinforcement. This paper, with a case study of the maintenance and reinforcement project of Zhicheng Yangtze River Bridge (steel truss highway-railway combined bridge), adopted MIDAS to establish finite element analysis model, and with stress and deformation as monitoring parameters, completed the construction monitoring work, numerical simulation analysis and site test for the reinforcement project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

89-94

Citation:

Online since:

February 2018

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2018 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] G. W. Ceng, S. C. Zhang. Construction, supervision, test and assessment of the main bridge of Wuhu Yangtze River Bridge. China Railway Sci. 05 (2001) 76-83.

Google Scholar

[2] C. Su, T. Wang, X. M. Fan. Technique process and chief results of construction control for Guangdong Xijiang Bridge. J. Fuzhou Univ. (Nat. Sci.), S1 (2005) 254-259.

Google Scholar

[3] W. Wang. Detail analysis and research of railroad steel truss bridge with integrated finite element method. Southwest Jiaotong University, (2004).

Google Scholar

[4] M. Y. Zhang. Research in construction simulation analysis for large-span steel-truss bridge based on the step-by-step model method. Wuhan University of Science and Technology, (2012).

Google Scholar

[5] X. H. Duan. Analysis on cracks in light-type thin-wall abutments. Shanxi Arch. 32 (2007) 341-342.

Google Scholar

[6] Y. Wen. Reinforcing technology regarding steel joist beams in present use. Chongqing Archit. 11 (2011).

Google Scholar