Abstract:

Mid-Life Refurbishment (MLR) is a process conducted in many industries to improve or extend the life span of assets such as machines, infrastructures and systems. The objective of MLR works execution is to extend the life span, sustain the train performance and achieve system reliability. Typically, the refurbishment scope consists of overhaul, upgrading and rectification works. The biggest challenge is to determine) the scope of refurbishment works and to create equilibrium between the feasibility and viability of the project. Therefore, the main objective of this paper is to discuss the current practice of performing MLR maintenance through the utilization of Failure Mode and Effect Analysis (FMEA) and to transform the existing FMEA used by the automotive industry to fulfil the needs of Rolling Stock. The use of FMEA is critical in determining) the scope of train refurbishment work. It was carried out at the initial stages of the process in order to determine Risk Priority Number (RPN) to prioritize the type of refurbishment plans and scope. The design of the FMEA Worksheets, De-sign of FMEA severity Evaluation Criteria, Design of Occurrence Evaluation Criteria and Design of FMEA Prevention/Detection Criteria were adopted and adapted from the generic format so that it is coherent with Railway Industries. The results based on the transformation framework, the plan and scope of overhaul, upgrading and rectification were defined using the FMEA. Out of the 80 elements of MLR works that were analyzed using the FMEA approach, it was found that 46 elements needed overhaul, 23 elements needed upgrading and 11 elements needed rectification works. Finally, the application of the FMEA helped determine the MLR scope of work from 13 systems. The case study was taken from the Malaysia LRT Project, and currently the fleet has been in operation for more than 20 years (operated since year 1998).

You might also be interested in these eBooks

Info:

Periodical:

Pages:

238-252

Citation:

Online since:

June 2020

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2020 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] G. L. Giacco, D. Carillo, A. D'Ariano, D. Pacciarelli, and Á. G. Marín, Short-term Rail Rolling Stock Rostering and Maintenance Scheduling,, Transportation Research Procedia, vol. 3, pp.651-659, (2014).

DOI: 10.1016/j.trpro.2014.10.044

Google Scholar

[2] K. O. Kim and M. J. Zuo, General model for the risk priority number in failure mode and effects analysis,, Reliability Engineering & System Safety, vol. 169, pp.321-329, (2018).

DOI: 10.1016/j.ress.2017.09.010

Google Scholar

[3] R. Renu, D. Visotsky, S. Knackstedt, G. Mocko, J. D. Summers, and J. Schulte, A Knowledge Based FMEA to Support Identification and Management of Vehicle Flexible Component Issues,, Procedia CIRP, vol. 44, pp.157-162, (2016).

DOI: 10.1016/j.procir.2016.02.112

Google Scholar

[4] P. Struss and A. Fraracci, Automated Model-based FMEA of a Braking System,, IFAC Proceedings Volumes, vol. 45, no. 20, pp.373-378, 2012/01/01/ (2012).

DOI: 10.3182/20120829-3-mx-2028.00230

Google Scholar

[5] Opportunities & challenges for the railway, O. o. R. Regulation, (2013).

Google Scholar

[6] N. Business. (2017, November 2, Dec 11, 2017). Prasarana may award up to RM2b LRT3 contracts by year end. Available: https://www.nst.com.my/business/2017/11/298351/ prasarana-may-award-rm2b-lrt3-contracts-year-end.

Google Scholar

[7] C. O. L. Mansor. (2016, February 22, Dec 11, 2017). MRT project on track and well within budget,. Available: https://www.nst.com.my/news/2016/02/128832/mrt-project-track-and-well-within-budget.

Google Scholar

[8] Bernama. (2017, April 1, Dec 11, 2017). MRT Corp awards 31 packages worth RM30bil for SSP line. Available: https://www.thestar.com.my/business/business-news/2017/04/01/mrt-corp-awards-31-packages-worth-rm30bil-for-ssp-line/.

Google Scholar

[9] S. Azman. (2017, November 6, Dec 11, 2017). MRT Corp calls for tender to build and finance MRT3 line. Available: http://www.theedgemarkets.com/article/mrt-corp-calls-tender-build-and-finance-mrt3-line.

Google Scholar

[10] F. Yeoh. (2017, December 14, Feb 7, 2018). Big rail catalyst around the corner for YTL Corp. Available: https://www.thestar.com.my/business/business-news/2017/12/14/big-rail-catalyst-around-the-corner-for-ytl-corp/#5ytYwM7DQIXmTrob.99.

Google Scholar

[11] E. Z. S. Azman. (2017, October 6, Dec 11, 2017). Expert estimates cost of Kuala Lumpur-Singapore HSR at S$20b-S$25b. Available: http://www.theedgemarkets.com/article/expert-estimates-cost-kuala-lumpursingapore-hsr-s20bs25b.

Google Scholar

[12] G. K. G. Kana. (2017, August 12, Dec 11, 2017). The real economics of ECRL. Available: https://www.thestar.com.my/business/business-news/2017/08/12/the-real-economics-of-ecrl/.

Google Scholar

[13] N. A. M. Radhi. (2018, March 6, 2018, March 13). SPAD to propose tram service for Putrajaya, Cyberjaya, Bangi and Kajang. Available: https: //www.nst.com.my/news/nation/2018/03/342150/spad-propose-tram-service-putrajaya-cyberjaya-bangi-and-kajang.

Google Scholar

[14] N. V. Bang, Rolling Stock Maintenance Manuals , November, (2015).

Google Scholar

[15] M. Pascal and C. André-Philippe, Traction drive refurbishment: An innovative and cheap breakdown strategy to guarantee rolling stock life for railway operators?,, in 2016 International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles & International Transportation Electrification Conference (ESARS-ITEC), 2016, pp.1-5.

DOI: 10.1109/esars-itec.2016.7841367

Google Scholar

[16] S. Gundra, Repair and Maintenance Manual. Bombardier Transportation, (2015).

Google Scholar

[17] A. Khatab, C. Diallo, U. Venkatadri, Z. Liu, and E. H. Aghezzaf, Optimization of the joint selective maintenance and repairperson assignment problem under imperfect maintenance,, Computers & Industrial Engineering, vol. 125, pp.413-422, (2018).

DOI: 10.1016/j.cie.2018.09.012

Google Scholar

[18] J. Andrés, L. Cadarso, and Á. Marín, Maintenance Scheduling in Rolling Stock Circulations in Rapid Transit Networks,, Transportation Research Procedia, vol. 10, pp.524-533, (2015).

DOI: 10.1016/j.trpro.2015.09.006

Google Scholar

[19] B. P. Donohue, Seattle Center Monorail Train Refurbishment Program,, presented at the ASME 2011 Rail Transportation Division Fall Technical Conference, (2011).

DOI: 10.1115/rtdf2011-67021

Google Scholar

[20] M. Norris, Planning to Extend the Life of Major Assets,, Procedia CIRP, vol. 11, pp.207-212, (2013).

DOI: 10.1016/j.procir.2013.07.049

Google Scholar

[21] I. F. P. J. H. Mooren Ceng MimechE and L. A. M. van Dongen, Application of Remote Condition Monitoring in Different Rolling Stock Life Cycle Phases,, Procedia CIRP, vol. 11, pp.135-138, (2013).

DOI: 10.1016/j.procir.2013.07.050

Google Scholar

[22] C. Kessell. (2017, Dec 12,17). Obsolescence Management. Available: https://www.railengineer.uk/2017/03/13/obsolescence-management/.

Google Scholar

[23] S. R. E. (SRS). (2017). SUNRISE: C651MID-LIFE UPGRADING. Available: http://www.singrail.com.sg/solutions-services/engineering-procurement-construction-epc/portfolio-c-651-mid-life-upgrade/.

Google Scholar

[24] D. Canca and E. Barrena, The integrated rolling stock circulation and depot location problem in railway rapid transit systems,, Transportation Research Part E: Logistics and Transportation Review, vol. 109, pp.115-138, (2018).

DOI: 10.1016/j.tre.2017.10.018

Google Scholar

[25] Y. Shen and S. P. Willems, Modeling sourcing strategies to mitigate part obsolescence,, European Journal of Operational Research, vol. 236, no. 2, pp.522-533, (2014).

DOI: 10.1016/j.ejor.2014.01.025

Google Scholar

[26] P. Sandborn, Design for Obsolescence Risk Management,, Procedia CIRP, vol. 11, pp.15-22, (2013).

DOI: 10.1016/j.procir.2013.07.073

Google Scholar

[27] C.-H. Miao, Planned obsolescence and monopoly undersupply,, Information Economics and Policy, vol. 23, no. 1, pp.51-58, (2011).

DOI: 10.1016/j.infoecopol.2010.03.003

Google Scholar

[28] A. Baker, Configurable Obsolescence Mitigation Methodologies,, Procedia CIRP, vol. 11, pp.352-356, (2013).

DOI: 10.1016/j.procir.2013.07.013

Google Scholar

[29] R. E. McDermott, Mikulak, R. J. & Beauregard M. R., The Basics of FMEA. 270 Madison Avenue, New York, NY 10016: CRC Press, (2009).

Google Scholar