p.98
p.108
p.113
p.121
p.128
p.133
p.137
p.146
p.151
Seepage Analysis and Construction Practice of Anchorage Circular Foundation Excavation in Long-Span Suspension Bridge
Abstract:
Abstract:On the basis of preliminary exploration, complement exploration is executed to obtain excavation seepage analysis detail parameters. According to the three-dimension finite difference method and regulating calculation method, the excavation seepage analysis of anchorage circular foundation at Huangpu bridge south and the influence of different depth rock-socketed on foundation seepage are discussed. With the experience in similar projects at home and abroad, the depth of diaphragm wall embedded in weak weathered rock is not less than 3 meters, grouting curtain wall consists of 10 meters, and the waterproof curtain outside the foundation is canceled from preliminary design. The stress, strain and water level are monitored during the excavation process, and the deformation of the supporting structure is within the control. The structure is under reasonable force and the sealing effect is obvious when the foundation is excavated. Construction practice shows that the excavation seepage analysis of anchorage circular foundation at Huangpu bridge south are consistent with engineering practice.
Info:
Periodical:
Pages:
128-132
Citation:
Online since:
September 2011
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: