Seepage Analysis and Construction Practice of Anchorage Circular Foundation Excavation in Long-Span Suspension Bridge

Article Preview

Abstract:

Abstract:On the basis of preliminary exploration, complement exploration is executed to obtain excavation seepage analysis detail parameters. According to the three-dimension finite difference method and regulating calculation method, the excavation seepage analysis of anchorage circular foundation at Huangpu bridge south and the influence of different depth rock-socketed on foundation seepage are discussed. With the experience in similar projects at home and abroad, the depth of diaphragm wall embedded in weak weathered rock is not less than 3 meters, grouting curtain wall consists of 10 meters, and the waterproof curtain outside the foundation is canceled from preliminary design. The stress, strain and water level are monitored during the excavation process, and the deformation of the supporting structure is within the control. The structure is under reasonable force and the sealing effect is obvious when the foundation is excavated. Construction practice shows that the excavation seepage analysis of anchorage circular foundation at Huangpu bridge south are consistent with engineering practice.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

128-132

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Beijing Tongda Technology Company. The complement and consultation design report of diaphragm wall anchor in Guangzhou Pearl River Huangpu Bridge suspension bridge[R]. 2005, 4.(In Chinese).

Google Scholar

[2] CONG Aisen. Discussion on several issues of seepage stability of deep foundation pit multilayered formation[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 10, 28(10): 2018-2023. (In Chinese).

Google Scholar

[3] Weici GU. Principle and application of seepage[M]. Beijing: China Building Materials Industry Press, 2000, 8. (In Chinese).

Google Scholar

[4] Yueming ZHU, Daoyong GONG. Solution to3-D unsteady saturated-unsaturated seepage problem and accurate treatment of saturated and unsaturated exit surfaces of seepage[J]. Advances in water science, 2003, 1, 14(1):67-70. (In Chinese).

Google Scholar

[5] Guang Dong Noneferrous Metals Engineering Investigation Design Institute. The complement and reconnaissance report of hydrogeology anchor area in Guangzhou Pearl River Huangpu Bridge suspension bridge[R]. 2005, 3. (In Chinese).

Google Scholar