Comparative Analysis of CRD Method and Three-Bench Method with Temporary Invert

Abstract:

Article Preview

CRD method and three-bench method with temporary invert, which are applied to shallow buried and large cross-section tunnel engineering, are discussed, and simulated by FLAC2D so as to study the variation feature of displacement field, surrounding rock disturbance and internal supporting force caused by the excavation. According to the simulation results, it is proved that CRD method, with higher safety, can control tunnel collapse effectively while three-bench method quickens construction schedule. Therefore, it is recommended that the two methods are used for excavating tunnels alternately if possible so that it will increase economic benefit.

Info:

Periodical:

Edited by:

Xuejun Zhou

Pages:

1834-1839

DOI:

10.4028/www.scientific.net/AMM.90-93.1834

Citation:

R. B. Wang et al., "Comparative Analysis of CRD Method and Three-Bench Method with Temporary Invert", Applied Mechanics and Materials, Vols. 90-93, pp. 1834-1839, 2011

Online since:

September 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.