Comparative Analysis of CRD Method and Three-Bench Method with Temporary Invert

Article Preview

Abstract:

CRD method and three-bench method with temporary invert, which are applied to shallow buried and large cross-section tunnel engineering, are discussed, and simulated by FLAC2D so as to study the variation feature of displacement field, surrounding rock disturbance and internal supporting force caused by the excavation. According to the simulation results, it is proved that CRD method, with higher safety, can control tunnel collapse effectively while three-bench method quickens construction schedule. Therefore, it is recommended that the two methods are used for excavating tunnels alternately if possible so that it will increase economic benefit.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1834-1839

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wenguo Ning. Shanxi Architecture, 2009, 35(5):316-317 (In Chinese)

Google Scholar

[2] Pengshe Zhao. Railway Engineering, 2010, 8:77-80 (In Chinese)

Google Scholar

[3] Liangjian Ma. China High Technology Enterprises, 2010, 142(7):166-167 (In Chinese)

Google Scholar

[4] Xiaopeng Cui, Yunfeng Sun, Guanghong Wang, Min Hou. Tunnel Construction, 2010, 30(2):131-132 (In Chinese)

Google Scholar

[5] Lidong Zhang. Shanxi Architecture, 2009, 35(4):342-343 (In Chinese)