p.3131
p.3135
p.3141
p.3145
p.3151
p.3155
p.3161
p.3166
p.3173
Evaluation and Governance Design of Risk Factor of Debris Flow on Gunmaling
Abstract:
Abstract: It is analyzed and obtained the result that the debris flow is currently in mature stage with medium risk and high occurrence through the gray correlation method of fractal research and effect measure of debris flow gully. Therefore, it is necessary to take corresponding governance measures. In this article, check dam is used as main preventive engineering measures to set up two check dams in the passing area of debris flow, with total capacity about 2800m3 and design reservoir capacity of flood once per 50 years. Construction of the check dam will effectively reduce risk of debris flow.
Info:
Periodical:
Pages:
3151-3154
Citation:
Online since:
September 2011
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: