Research on Treatment Scheme Optimization for Slope Based on Analytic Hierarchy Process

Article Preview

Abstract:

At present, there are numerous treatment schemes for slope, while there is a lack of research on scheme evaluation and optimization. According to analytic hierarchy process, this paper takes two treatment schemes for Cangshang pit slope as research object, which are reducing load by cutting slope and strengthening by grouting, handles the complicated problem hierarchically and systematically, and establishes hierarchical structure model. Judgment matrixes are constructed to analyze multiple factors synthetically, which combine qualitative analysis and quantitative analysis preferably, and optimal scheme is selected finally.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

402-405

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yawei Xie: Risk Management and Assurance of Projects (Tsinghua University Press, China, 2009).

Google Scholar

[2] Jianming Shen: Risk Management of Projects (China Machine Press, China, 2008).

Google Scholar

[3] Huaixiang Liu, Sheng Zeng: Journal of China & Foreign Highway. Vol. 5 (2007), p.27

Google Scholar

[4] Xiaoyi Fan, Jianping Qiao, Yongbo Chen: Journal of Natural Disasters. Vol. 1 (2004), p.72

Google Scholar