Wagon Hours Saved by Transferring Wagons without Sorting Operations at Technical Station

Article Preview

Abstract:

For the method calculating the benefits gotten by transferring the wagons at technical stations without sorting operations, two different calculating methods are brought forward at present. This paper firstly calculates the wagon hours consumed both when the basic scheme is applied and the scheme in which the trough wagon flows passing the technical station without shunting operations is applied, and then deduces a formula to calculate the wagon hours saved by through wagon flow passing technical station without sorting operations and analyzes deeply the affecting factors. As a result, it is found that the two calculating methods are the special cases of it. Because in the calculating process the influence of through wagon flow passing the station to the staying time at the station has been taken into account, the method mentioned above is more complete, and could provide a theoretical basis for the calculation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

498-502

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hao Yang and Shiwei He: Railway Transportation Organization (Railway Press of China, Beijing 2001). (In Chinese)

Google Scholar

[2] Shide Zheng and Hanlin Wu: Railway Train Operation Organization (Railway Press of China, Beijing 1988). (In Chinese)

Google Scholar

[3] Qiyuan Peng: Railway Operation Organization (Railway Press of China, Beijing 2007). (In Chinese)

Google Scholar

[4] Mingjun Qian: Journal of Lanzhou Jiaotong University, Vol. 26(3) (2007), p.48 (In Chinese)

Google Scholar

[5] Xiamiao Li: Journal of Changsha Railway Institute, Vol. 11(2) (1993), p.36 (In Chinese)

Google Scholar