A Closed-Loop Test System for Network Performance of Smart Substation

Article Preview

Abstract:

The key support technology of smart substation testing technology is analyzed, the concrete application of smart substation is combined with the traditional network testing, and the function of real-time network packet analysis is introduced, which has make the process of smart substation layer network test form a closed loop system, extend and improve the system of smart substation performance test. And links to the reality, to the transformer substation switchboard network storm suppression function, the time delay, lost projects and so on the frame rate to carry on the statistics, the contrast has confirmed this plan feasibility and the validity.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1008-1009)

Pages:

694-700

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Feng Shanqiang, Huang Shu, Hu Chunchao. Research on Testing Technology of Industrial Ethernet Switch used in Smart Substations. Guang Dong Electric Power, 2012, 11 (25): 25-29.

Google Scholar

[2] Zeng Qingyu. The Development of Substation Automation in the near future—Part One Deregulated Power Market and Coordination Automation. Automation of Electric Power Systems (2000).

Google Scholar

[3] Zeng Qingyu. The Development of Substation Automation in the near future—Part Two Integrated Automation, Life Cycle Costs. Automation of Electric Power Systems. (2000).

Google Scholar

[4] Feng Lin, Mu Hu, Yuanchen Jiang, Bin Ni. Architecture and Related Techniques of a Power Dispatching Data Platform. Automation of Electric Power Systems, 2007, 31 (1): 61-64.

Google Scholar

[5] Xinquan Zhang, Deshen Liang, Xicai Zhao. Time synchronization and its application in substation. Relay. 2008, 36(9): 69-72, 86.

Google Scholar

[6] Yantao Zhang, Lun Huang, Qingping Liu, etc. Scheme and Application of IEC 61850 Standard Conformance Test. Automation of Electric Power Systems, 2008, 32 (4): 98-102.

Google Scholar

[7] Dan Sun, Yuxiang Shi, Zhicheng Liang, etc. Research and laboratory realization of IEC 61850 Standard Conformance Test. Jiangsu Electrical Engineering, 2007, 26: 66-68.

Google Scholar

[8] Bruce Muschlitz, IEC 61850 Conformance Testing: Goals,Issues and Status. DistribuTECH, Tampa,Florida,USA,(2006).

Google Scholar

[9] Wei He, Jingsong Xu. Discussion the Conformance Testing Rules of IEC 60870-5-6. Automation of Electric Power Systems 2003, 27(15): 78-79.

Google Scholar

[10] Juanping Xu, Guoqiang Mu, Qingping Wang. Research on Conformance Simulation Testing System Based on IEC 61850. Power System Technology, 2007, 31(18): 83-86.

Google Scholar

[11] Tianqi Xu, HuiHou, Hongwei Yu, etc. Analysis on IEC 61850 Interoperability Support . in: IEEE Power Engineering Society General Meeting 2007. Tempa Florida, USA. 2007, VOLS 1-10: 3570-3575.

DOI: 10.1109/pes.2007.386057

Google Scholar