p.270
p.275
p.280
p.284
p.288
p.292
p.297
p.301
p.305
Stability Evaluation of Fill Dam in Graphite Mine Tailings Impoundment
Abstract:
The graphite mine tailings impoundment was detailed investigated, and the structural features of fill dam in the graphite mine tailings impoundment was analyzed. Then the author created the stability calculating model of this fill dam, calculated its stability coefficient, and evaluated its stability. It can be concluded that: the fill dam was stable under the condition of normal operation, and it was unstable under the condition of flood operation and special operation.
Info:
Periodical:
Pages:
288-291
Citation:
Online since:
August 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: