[1]
LIU Fuying, Risk Evaluation of Bridge Construction, Chang'an University, Xi'an (2005, in Chinese).
Google Scholar
[2]
RUAN Xin, Risk Assessment System and Key Issues for Bridge Engineering, Tongji University, Shanghai (2006, in Chinese).
Google Scholar
[3]
YANG Lei and TIAN Zhongchu, The Application of Fuzzy Comprehensive Evaluation in Risk Assessment of Bridge Incremental Launching Construction, Highways and Automotive Applications (2012, in Chinese).
Google Scholar
[4]
ZHANG Geng, Fundamental Study of Probabilistic Fuzzy Logic System with Application in Complex Modeling, Central South University (2012, in Chinese).
Google Scholar
[5]
GUO Dongchen, Studies of the Steel-Concrete Composite Continuous Beam Bridge Risk Assessment on Construction Phase, Beijing Jiaotong University (2012, in Chinese).
Google Scholar
[6]
GAO Xuelei, Study on the Optimization of Highway Bridge Construction Risk Assessment, Chang'an University, Xi'an (2012, in Chinese).
Google Scholar
[7]
George J. KLIR, Foundations of Fuzzy Set Theory and Fuzzy Logic: A Historical Overview, New York, USA, (2010).
Google Scholar
[8]
YU Jianxing, Project Risk Assessment and Control, China Architecture and Building Press (2009, in Chinese).
Google Scholar
[9]
Roger Flanagan and George Norman: Risk Management and Construction, Blackwell Science, (1993).
Google Scholar
[10]
Marvin Rausand, Risk Assessment Theory, Methods, and Application, John Wiley & Sons, Inc., (2011).
Google Scholar