Designing a Practical Production Scheduling and Control System: A Case Study in a Norwegian Manufacturing Company

Article Preview

Abstract:

Production scheduling and control under uncertainty is among the most persistent challenges in the field of operation management. Despite the significant amount of research in this domain, many studies still underline the gap between scheduling theory and practice. In this paper, we outline the important aspects to consider in the design and implementation of decision support systems for the scheduling task by reviewing the literature. From the identified guidelines, we examine a practical case and propose a decision support system for the production scheduling task in an actual manufacturing environment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

669-676

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] P. P. M. Stoop and V. C. S. Wiers, The complexity of scheduling in practice, International Journal of Operations& Production Management, vol. 16, pp.37-53, (1996).

DOI: 10.1108/01443579610130682

Google Scholar

[2] G. E. Vieira, J. W. Herrmann, and E. Lin, Rescheduling manufacturing systems: a framework of strategies, policies, and methods, Journal of Scheduling, vol. 6, pp.39-62, (2003).

Google Scholar

[3] H. Aytug, M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy, Executing production schedules in the face of uncertainties: A review and some future directions, European Journal of Operational Research, vol. 161, pp.86-110, (2005).

DOI: 10.1016/j.ejor.2003.08.027

Google Scholar

[4] G. G. Meyer, J. Wortmann, and N. B. Szirbik, Production monitoring and control with intelligent products, International Journal of Production Research, vol. 49, pp.1303-1317, (2011).

DOI: 10.1080/00207543.2010.518742

Google Scholar

[5] C. de Snoo, W. van Wezel, J. Wortmann, and G. J. C. Gaalman, Coordination activities of human planners during rescheduling: Case analysis and event handling procedure, International Journal of Production Research, vol. 49, pp.2101-2122, (2011).

DOI: 10.1080/00207541003639626

Google Scholar

[6] M. L. Pinedo, Planning and Scheduling in Manufacturing and Services, 3rd ed. Berlin: Springer, (2007).

Google Scholar

[7] H. -H. Hvolby and K. Steger-Jensen, Technical and industrial issues of Advanced Planning and Scheduling (APS) systems, Computers in Industry, vol. 61, pp.845-851, (2010).

DOI: 10.1016/j.compind.2010.07.009

Google Scholar

[8] V. C. S. Wiers, Human-computer interaction in production scheduling: analysis and design of decision support systems for production scheduling tasks, PhD diss., Technische Universitiet Eindhoven, (1997).

Google Scholar

[9] S. Crawford, B. MacCarthy, J. Wilson, and C. Vernon, Investigating the work of industrial schedulers through field study, Cognition, Technology & Work, vol. 1, pp.63-77, (1999).

DOI: 10.1007/s101110050033

Google Scholar

[10] S. Jackson, J. R. Wilson, and B. L. MacCarthy, A new model of scheduling in manufacturing: tasks, roles, and monitoring, Human Factors: The Journal of the Human Factors and Ergonomics Society, vol. 46, pp.533-550, (2004).

DOI: 10.1518/hfes.46.3.533.50393

Google Scholar

[11] M. Berglund and J. Karltun, Human, technological and organizational aspects influencing the production scheduling process, International Journal of Production Economics, vol. 110, pp.160-174, (2007).

DOI: 10.1016/j.ijpe.2007.02.024

Google Scholar

[12] J. Karltun and M. Berglund, Contextual conditions influencing the scheduler's work at a sawmill, Production Planning and Control, vol. 21, pp.359-374, (2010).

DOI: 10.1080/09537280903453885

Google Scholar

[13] K. N. McKay and V. C. S. Wiers, Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory, Computers in Industry, vol. 50, pp.5-14, (2003).

DOI: 10.1016/s0166-3615(02)00146-x

Google Scholar

[14] A. Pfeiffer, B. Kádár, and L. Monostori, Stability-oriented evaluation of rescheduling strategies, by using simulation, Computers in Industry, vol. 58, pp.630-643, (2007).

DOI: 10.1016/j.compind.2007.05.009

Google Scholar

[15] K. Hozak and J. A. Hill, Issues and opportunities regarding replanning and rescheduling frequencies, International Journal of Production Research, vol. 47, pp.4955-4970, (2009).

DOI: 10.1080/00207540802047106

Google Scholar

[16] J. Riezebos, J. -M. Hoc, N. Mebarki, C. Dimopoulos, W. Van Wezel, and G. Pinot, Design of scheduling algorithms, in Behavioral Operations in Planning and Scheduling, J. C. Fransoo, T. Waefler, and J. R. Wilson, Eds., ed Berlin: Springer-Verlag, 2011, pp.299-321.

DOI: 10.1007/978-3-642-13382-4_12

Google Scholar

[17] J. M. Framinan and R. Ruiz, Guidelines for the deployment and implementation of manufacturing scheduling systems, International journal of production research, vol. 50, pp.1799-1812, (2012).

DOI: 10.1080/00207543.2011.564670

Google Scholar

[18] K. N. McKay and V. Wiers, Unifying the theory and practice of production scheduling, Journal of Manufacturing Systems, vol. 18, pp.241-255, (1999).

DOI: 10.1016/s0278-6125(00)86628-5

Google Scholar

[19] V. C. Wiers, The relationship between shop floor autonomy and APS implementation success: evidence from two cases, Production Planning and Control, vol. 20, pp.576-585, (2009).

DOI: 10.1080/09537280903034289

Google Scholar

[20] W. Van Wezel, J. M. Hoc, and J. Cegarra, Allocating Functions to Human and Algorithm in Scheduling, in Behavioral Operations in Planning and Scheduling, J. C. Fransoo, T. Waefler, and J. R. Wilson, Eds., ed Berlin: Springer-Verlag, 2011, pp.339-370.

DOI: 10.1007/978-3-642-13382-4_14

Google Scholar

[21] J. -M. Hoc, From human–machine interaction to human–machine cooperation, Ergonomics, vol. 43, pp.833-843, (2000).

DOI: 10.1080/001401300409044

Google Scholar

[22] L. K. Ivert, Shop floor characteristics influencing the use of advanced planning and scheduling systems, Production Planning & Control, vol. 23, pp.452-467, (2012).

DOI: 10.1080/09537287.2011.564218

Google Scholar

[23] D. M. Strong and O. Volkoff, Understanding organization-enterprise system fit: a path to theorizing the information technology artifact, MIS quarterly, vol. 34, pp.731-756, (2010).

DOI: 10.2307/25750703

Google Scholar

[24] P. Jonsson and S. -A. Mattsson, Inventory management practices and their implications on perceived planning performance, International journal of production research, vol. 46, pp.1787-1812, (2008).

DOI: 10.1080/00207540600988071

Google Scholar

[25] K. N. McKay and V. C. S. Wiers, The human factor in planning and scheduling, in Handbook of Production Scheduling, J. W. Herrmann, Ed., ed New York: Springer Science+Business Media, Inc, 2006, pp.23-57.

DOI: 10.1007/0-387-33117-4_2

Google Scholar

[26] C. A. Méndez, J. Cerdá, I. E. Grossmann, I. Harjunkoski, and M. Fahl, State-of-the-art review of optimization methods for short-term scheduling of batch processes, Computers & Chemical Engineering, vol. 30, pp.913-946, (2006).

DOI: 10.1016/j.compchemeng.2006.02.008

Google Scholar

[27] J. Cegarra, A cognitive typology of scheduling situations: A contribution to laboratory and field studies, Theoretical Issues in Ergonomics Science, vol. 9, pp.201-222, (2008).

DOI: 10.1080/14639220601095379

Google Scholar

[28] F. B. Vernadat, Enterprise modelling and integration: Springer, (2003).

Google Scholar

[29] T. Brzęczek and D. Nowak, Genetic algorithm modification for production scheduling, Foundations of Computing and Decision Sciences, vol. 38, pp.299-309, (2013).

DOI: 10.2478/fcds-2013-0015

Google Scholar

[30] Z. Zakaria and S. Petrovic, Genetic algorithms for match-up rescheduling of the flexible manufacturing systems, Computers & Industrial Engineering, vol. 62, pp.670-686, (2012).

DOI: 10.1016/j.cie.2011.12.001

Google Scholar