[1]
XU Zhi-yong, ZHANG Xu-dong, ZENG Ming, etal. Application of ANP-based multilevel fuzzy comprehensive evaluation methods to post-evaluation for grid construction projects [J]. East China Electric Power, 2009, (03): 488-491. (In Chinese).
Google Scholar
[2]
Xiufan Ma, Siyao Lu, Ying Zhou. The post-evaluation index system for preparatory work of transmission and transformation projects[C]. Power Engineering and Automation Conference (PEAM), 2011 IEEE, Wuhan, 2011: 363-366.
DOI: 10.1109/peam.2011.6134875
Google Scholar
[3]
Wang Hong, Lin Zhenzhi, Wen Fushuan, et al. A comprehensive evaluation index system for power system operation[C]. Sustainable Power Generation and Supply (SUPERGEN 2012), International Conference on, Hangzhou, 2012: 1-6.
DOI: 10.1049/cp.2012.1842
Google Scholar
[4]
Wang Jing, Kou Ling-yue, Liu Juan, etal. Whole process post evaluation system of grid investment projects [J]. NORTH CHINA LECTRIC POWER, 2012, (03): 67-70. (In Chinese).
Google Scholar
[5]
ZENG Ming, YAN Fan, TIAN Kuo, etal. Analysis of investment benefit of smart electric grid based on triangular fuzzy numbers [J]. East China Electric Power, 2010, (05): 638-641. (In Chinese).
Google Scholar
[6]
Li Cheng-ren. Comprehensive Post-Evaluation of Rural Electric Network Reformation Based on Fuzzy Interval Number AHP[C]. Risk Management & Engineering Management, 2008. ICRMEM '08. International Conference on, Beijing, 2008: 171-177.
DOI: 10.1109/icrmem.2008.86
Google Scholar
[7]
YANG Wei-hong, HE Yong-xiu, LI De-zhi, etal. Comprehensive post-evaluation method of power netwok renovation project based on fuzzy interval evaluation and analytic hierarchy process [J]. Power System Technology, 2009, (05): 33-37. (In Chinese).
Google Scholar
[8]
Liu Yuxun, Min Song. AHP and Grey Relational Analysis of Synthetical Evaluation Index System of Grinding Process[C]. Intelligent Systems and Applications, 2009. ISA 2009. International Workshop on, Wuhan, 2009: 1-4.
DOI: 10.1109/iwisa.2009.5072697
Google Scholar
[9]
Zhang Tao, Liu Hongyan. Determination of index weights on interval grey number correlation[C]. Power Electronics and Intelligent Transportation System (PEITS), 2009 2nd International Conference on, Shenzhen, 2009: 224-227.
DOI: 10.1109/peits.2009.5406841
Google Scholar
[10]
Lilja K. K., Laakso K., Palomki J. Using the Delphi method[C]. Technology Management in the Energy Smart World (PICMET), 2011 Proceedings of PICMET '11, Portland, OR, 2011: 1-10.
Google Scholar
[11]
Sinuany-Stern Z., Amitai A. The post-evaluation of an engineering project via AHP[C]. Technology Management : the New International Language, Portland, OR, 1991: 275-277.
DOI: 10.1109/picmet.1991.183632
Google Scholar
[12]
Fang Jun, Yin Qin. Discussion on calculation method of adaptability evaluation index weights of engineering standards and regulations based on entropy theory[C]. Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on, Lushan, 2011: 1156-1159.
DOI: 10.1109/icetce.2011.5775860
Google Scholar
[13]
ZHOU Erxiong, LI Fengting, ZHU He. Cost-benefit evaluation of microgrid based on analytic hierarchy process(AHP) [J]. ELECTIC POWER CONSTRUCTON, 2013, (03): 1-6. (In Chinese).
Google Scholar
[14]
Ma Liye, Lu Zhigang, Hu Huawei, A fuzzy comprehensive evaluation metho for economic operation of urban distribution network based on interval number[J]. TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY, 2012, (08): 163-171. (In Chinese).
Google Scholar
[15]
LI Wen-hua, GUO Jun-peng. Interval weights and consisteny check of judgment matrix in the analyic hierarchy process[J]. SYSTEMS ENGINEERING-THEORY METHODOLOGY APPLICATIONS, 2004, (06): 530-532. (In Chinese).
Google Scholar
[16]
Juncai Zhang, Jinhui Zhao, Xun Qian. Risk Assessment of Mobile Payment System Security Based on Extension Theory[C]. Computer Science & Service System (CSSS), 2012 International Conference on, Nanjing, 2012: 880-883.
DOI: 10.1109/csss.2012.224
Google Scholar