Function Effects Post-Evaluation for Substation Construction Project Based on Multi-Level Extension Assessment Method

Article Preview

Abstract:

This paper established a multi-level extension model for function effects post-evaluation of substation construction project, the model not only reduces the influence of subjective factors on the evaluation results, but also can determines the key factors which affect the quality of the evaluation results and overall developing trend of the project and provides some suggestions for the project late operation. Taking into account the fact that the element of the judgment matrix formed by traditional AHP is a certain value and may lead to a big difference from the judgment matrix formed by the different group of experts, thus reduces the credibility of the evaluation results; In order to overcome the problem, this paper introduces the concept of interval number, the maximum and minimum of judgment matrix elements relative importance comparison are used as the upper and lower limits of interval number respectively. Interval number are used as the elements of judgment matrix to make the evaluation result more rational. At the end, a practical 220kV substation construction project is taken as an example to verify the validity and rationality of the established model.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1044-1045)

Pages:

1753-1759

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] XU Zhi-yong, ZHANG Xu-dong, ZENG Ming, etal. Application of ANP-based multilevel fuzzy comprehensive evaluation methods to post-evaluation for grid construction projects [J]. East China Electric Power, 2009, (03): 488-491. (In Chinese).

Google Scholar

[2] Xiufan Ma, Siyao Lu, Ying Zhou. The post-evaluation index system for preparatory work of transmission and transformation projects[C]. Power Engineering and Automation Conference (PEAM), 2011 IEEE, Wuhan, 2011: 363-366.

DOI: 10.1109/peam.2011.6134875

Google Scholar

[3] Wang Hong, Lin Zhenzhi, Wen Fushuan, et al. A comprehensive evaluation index system for power system operation[C]. Sustainable Power Generation and Supply (SUPERGEN 2012), International Conference on, Hangzhou, 2012: 1-6.

DOI: 10.1049/cp.2012.1842

Google Scholar

[4] Wang Jing, Kou Ling-yue, Liu Juan, etal. Whole process post evaluation system of grid investment projects [J]. NORTH CHINA LECTRIC POWER, 2012, (03): 67-70. (In Chinese).

Google Scholar

[5] ZENG Ming, YAN Fan, TIAN Kuo, etal. Analysis of investment benefit of smart electric grid based on triangular fuzzy numbers [J]. East China Electric Power, 2010, (05): 638-641. (In Chinese).

Google Scholar

[6] Li Cheng-ren. Comprehensive Post-Evaluation of Rural Electric Network Reformation Based on Fuzzy Interval Number AHP[C]. Risk Management & Engineering Management, 2008. ICRMEM '08. International Conference on, Beijing, 2008: 171-177.

DOI: 10.1109/icrmem.2008.86

Google Scholar

[7] YANG Wei-hong, HE Yong-xiu, LI De-zhi, etal. Comprehensive post-evaluation method of power netwok renovation project based on fuzzy interval evaluation and analytic hierarchy process [J]. Power System Technology, 2009, (05): 33-37. (In Chinese).

Google Scholar

[8] Liu Yuxun, Min Song. AHP and Grey Relational Analysis of Synthetical Evaluation Index System of Grinding Process[C]. Intelligent Systems and Applications, 2009. ISA 2009. International Workshop on, Wuhan, 2009: 1-4.

DOI: 10.1109/iwisa.2009.5072697

Google Scholar

[9] Zhang Tao, Liu Hongyan. Determination of index weights on interval grey number correlation[C]. Power Electronics and Intelligent Transportation System (PEITS), 2009 2nd International Conference on, Shenzhen, 2009: 224-227.

DOI: 10.1109/peits.2009.5406841

Google Scholar

[10] Lilja K. K., Laakso K., Palomki J. Using the Delphi method[C]. Technology Management in the Energy Smart World (PICMET), 2011 Proceedings of PICMET '11, Portland, OR, 2011: 1-10.

Google Scholar

[11] Sinuany-Stern Z., Amitai A. The post-evaluation of an engineering project via AHP[C]. Technology Management : the New International Language, Portland, OR, 1991: 275-277.

DOI: 10.1109/picmet.1991.183632

Google Scholar

[12] Fang Jun, Yin Qin. Discussion on calculation method of adaptability evaluation index weights of engineering standards and regulations based on entropy theory[C]. Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on, Lushan, 2011: 1156-1159.

DOI: 10.1109/icetce.2011.5775860

Google Scholar

[13] ZHOU Erxiong, LI Fengting, ZHU He. Cost-benefit evaluation of microgrid based on analytic hierarchy process(AHP) [J]. ELECTIC POWER CONSTRUCTON, 2013, (03): 1-6. (In Chinese).

Google Scholar

[14] Ma Liye, Lu Zhigang, Hu Huawei, A fuzzy comprehensive evaluation metho for economic operation of urban distribution network based on interval number[J]. TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY, 2012, (08): 163-171. (In Chinese).

Google Scholar

[15] LI Wen-hua, GUO Jun-peng. Interval weights and consisteny check of judgment matrix in the analyic hierarchy process[J]. SYSTEMS ENGINEERING-THEORY METHODOLOGY APPLICATIONS, 2004, (06): 530-532. (In Chinese).

Google Scholar

[16] Juncai Zhang, Jinhui Zhao, Xun Qian. Risk Assessment of Mobile Payment System Security Based on Extension Theory[C]. Computer Science & Service System (CSSS), 2012 International Conference on, Nanjing, 2012: 880-883.

DOI: 10.1109/csss.2012.224

Google Scholar