Research on Risk Evaluation of Investment Decision Stage Base on Sensitivity Analysis for Building Engineering Projects

Article Preview

Abstract:

The Sensitivity Analysis is a risk valuation method to calculate the variety range of project economic effect evaluation index, and to judge the influence degree of project expectation target caused by indetermination factors. The paper discusses the risk evaluation of investment decision stage for building engineering projects based on Sensitivity Analysis, which would be beneficial to perfect the practice of the risk evaluation of investment decision stage for building engineering projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

131-134

Citation:

Online since:

October 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Leroy J Lsidore, W Edward Back. Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration, Journal of Construction Engineering and Management, 2002(3): 211-219.

Google Scholar

[2] Wang C W, Huang Y C. A New Approach to Calculating Project Cost Variance, International Journal of Project Management, 2000(18): 131-138.

DOI: 10.1016/s0263-7863(98)00077-5

Google Scholar

[3] Y P Poh,J H M Tah. Integrated Duration-cost Influence Network for Modeling Risk Impacts on Construction Tasks, Construction Management and Economics, 2006(24): 861-868.

DOI: 10.1080/01446190600658891

Google Scholar

[4] Kaled El-Rayes,Amr Kandil. Time-Cost-Quality Trade-Off Analysis for Highway Construction, Journal of Construction Engineering and Management, 2005(3): 477-486.

DOI: 10.1061/(asce)0733-9364(2005)131:4(477)

Google Scholar

[5] Peter Grundke. Top-down approaches for integrated risk management: How accurate are they? [J]. European Journal of Operational Research, 2010(203): 662–672.

DOI: 10.1016/j.ejor.2009.09.015

Google Scholar

[6] Mehran Zeynalian, Bambang Trigunarsyah, H. R. Ronagh. Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle's Risks[J]. Journal of Construction Engineering and Management, 2013(1): 51-59.

DOI: 10.1061/(asce)co.1943-7862.0000571

Google Scholar