GIS Based Coal Seam Floor DEM Construction According to Floor Contours and Considering Faults Distribution

Article Preview

Abstract:

Coal seam floor contours are one of the most important 8 mine maps, and was usually used for coal mine decision-making. However, the graph, which was expressed as lines, has many disadvantages, including inadequate intuitive, poor visibility, and weak in expression of three-dimensional morphology formation. Thus, the readers have to spend more time to reveal the spatial distribution of coal deposits. According to the coal seam floors contours, and considering the constraints of faults in coal seams, the following steps were implemented to acquire coal seam floor DEM, which are: 1) contours discrete; and 2) interpolation using Inverse Distance Weighted method (IDW). The process was easy-manipulated, and the results could reflect the spatial distribution of coal seams in an objective, intuitively, and strong visibility manner. The method could facilitate and guide the analysis of mine design and coal production.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

516-520

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Li Shanshan, Peng Man. Preliminary discussion on automatic transferring among three common formats of DEM. Geomatics & Spatial Information Technology. 2008, 31(3): 6-9.

Google Scholar

[2] Zhang Kaixuan, Pan Mengqing, Fang Hui, Wu Wenbo, Li Lei. The methods of utilizing contours to build DEM. Engineering of Surveying and Mapping, 2007, 16(3): 15-18.

Google Scholar

[3] Yang Xiaoyun, Tang Xianyuan, Liang Xin. Research on contour interpolation and accuracy assessment of DEM. Engineering of Surveying and Mapping, 2006, 15(2): 37-39.

Google Scholar

[4] Wu Xiao,Zhenqi Hu,Bikai Gong,Visualisation of the characteristics of Mining Subsidence with the Consideration of Topography -A Case Study in China. International Journal of Mining & Mineral Engineering, 2011, 3(1): 16-25.

DOI: 10.1504/ijmme.2011.041446

Google Scholar

[5] Xu Daozhu, Zhang Weizhu, Tian Hao, Xiong Shun. Study on the algorithm of accuracy evaluation of DEM based on constraint Delaunay triangulation. Engineering of Surveying and Mapping, 2013, 22(2): 75-78.

Google Scholar

[6] Wang Jihua, Liu Chuanzhi. A new method for drawing automatically the contour of fault. Engineering of Surveying and Mapping, 2005, 14(4): 46-54.

Google Scholar

[7] Liu Yonghe, Qi Yongan, Wang Yanping. Ad light shading mapping method for DEM map of coal-floor. Engineering of Surveying and Mapping, 2007, 16(6): 25-28.

Google Scholar

[8] Zhang Liping, Jin Xiangyang. 3D modeling method of coal seam with fault and realization based on Arcgis. Coal Mining Technology, 2009, 14(4): 21-22.

Google Scholar

[9] Zhang Jinming, Guo Liping. Effects of interpolation parameters in inverse distance weighted method on DEM accuracy. Journal of Geomatics Science and Technology, 2012, 29(1): 51-56.

Google Scholar