The Optimization for Management Model of Directly Transfer User in Regional Power Grid

Article Preview

Abstract:

This paper analyzes the direct transfer of user management problems in the existing schedule management, analysis how to optimize the current large regional power grid management model for the user’s scheduling, establish the effective management of large user scheduling system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1049-1050)

Pages:

609-612

Citation:

Online since:

October 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] AlaIl, R.M., James, S.N.&Cerry, M.K.Simulated annealing heuristics formanaging resources during planned outages at electric power plants[J].Computers&Operations Research, 2005, 32(1): 107—125.

DOI: 10.1016/s0305-0548(03)00206-5

Google Scholar

[2] Alessandro, A., Nicholas, G H.&Dario, P Supply chain scheduling: Sequence coordination[J].DiscreteApplied Mathematics, 2006, 154(15): 2044—(2063).

Google Scholar

[3] Aliev, R.A., Fazlollahi, B., Guirimov, B.Ct, et a1.Fuzzy-genetic approach to aggregate production-distribution planning in supply chain management[J].Information Sciences, 2007, 177(20): 4241-4255.

DOI: 10.1016/j.ins.2007.04.012

Google Scholar

[4] Amit B.&Thomas F S.The Impact of E-Business Technologies on Supply Chain Operation: A Macroeconomic Perspective[J].Research Department, 2004, 23(4): 57—65.

Google Scholar

[5] Ardanuy, J.E&Zufiria, P.J.Design and comparison of adaptive power system stabilizers based on neural fuzzy networks and genetic algorithms[J].Neurocomputing, 2007, 70(16): 2902—2912.

DOI: 10.1016/j.neucom.2006.06.014

Google Scholar