Research on the Synchronous Lifting Process Control of Large-Span Pre-Stressed Double-Layer Suspended Cable Roof

Article Preview

Abstract:

Based on the project of Foshan International Home Expo City, this paper studied the control measures of the synchronous lifting process control of large-span pre-stressed double-layer suspended cable roof, and summarized some key points, which could be used as the common reference for the similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

1363-1368

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Steel Design Code . GB50017-(2003).

Google Scholar

[2] Steel Construction Quality Acceptance (GB50205-2001).

Google Scholar

[3] Pre-stressed Steel Technical Specification CECS212: (2006).

Google Scholar

[4] Pre-stressed Concrete Strand GB / T 5224-(2003).

Google Scholar

[5] Structural Load Code . GB50009-(2001).

Google Scholar

[6] Liu Jun. The Application of well-type Roof in the Large-span Roof Frame Structure [J]. Gansu Science and Technology, 2001 (5).

Google Scholar

[7] Luo Bin, Guo Zhengxing. Research and Application on the Pre-stressed Construction Technology of Large-span Steel Structure -- Analysis of Pre-stressed Construction Technology of Large-span Steel Structure [J]. Construction Technology, 2011 (10).

DOI: 10.1109/icetce.2011.5776090

Google Scholar