Construction Technology of Long Spiral Bored Piles

Article Preview

Abstract:

Through the construction process of the Administrative Center Station, Kunming rail traffic, study the construction technology of long spiral bored piles, for engineering characteristics and difficulties, put forward the proposed measures, and analyze the application prospects of the technology.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

1564-1567

Citation:

Online since:

December 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ailing Ding, Long spiral bored pile safety management process, City Construction Theory Study [J], 2012(15).

Google Scholar

[2] Xiping Wang: Application of long spiral bored pile in fundamental engineering, Oil and gas fields ground engineering, 2008, 27(4).

Google Scholar

[3] General technical specification reinforced mechanical connection.

Google Scholar

[4] Acceptance of welded steel Specification, JGJ18-(2012).

Google Scholar

[5] Building Pile fundamental technical specifications, JGJ94-(2008).

Google Scholar

[6] Yuehui Deng: Compare and application of long spiral bored pile and manual hole digging pile, Domestic and foreign building, 2007(2).

Google Scholar

[7] Zheng Wang, Wei Zhuang: Study and application of long spiral bored pile construction technology, China Science and Technology Expo, 2011(26).

Google Scholar