The Key Technology of Short-Line Matching Method in Precast Segment Assembling of Externally Prestressed Concrete Bridges

Article Preview

Abstract:

Targeted at key technological difficulties of pre-stressed concrete bridge with precast segment assembling in short-line matching method, combined with the as-built projects and those under construction, this essay introduces systematic segmental precast assembly externally prestressed concrete construction technology in short-line matching method, and the developed serial complete equipments set, thus realizing development trend of factory-orientation, large-scale, mechanization, standardization of modern bridge construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

912-918

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Qian Jianzhang, Zhou Yiqiao. Comparison of Pre-stressed Concrete Box Girder Segment in Long-line Method and Short-line Method. Technology of Highway and Transport, 2003 (5).

Google Scholar

[2] Ge Yaojun. Analysis and Control of Bridge Construction in Sections. China Communications Press, (2003).

Google Scholar

[3] Li Huisheng, Zhang Luoxi. Analysis of Curve Girder Bridge Structure. China Railway Publishing House, (1992).

Google Scholar

[4] SEGMENTAL BRIDGE CASTING Machines, 2001 Nova Award Nomination 29.

Google Scholar

[5] Li Jianbin, Yang Qingzhong, Shi Xianfeng. Project Control of Pre-stressed Concrete Curve Continuous Girder Bridge Section Construction. Journal of Shijiazhuang Railway Institute, 2001 (1).

Google Scholar