Potential Analysis of Demand Response Based on Peak and Valley Time Price

Article Preview

Abstract:

Tou price is based on the price as the guidance, guiding power users according to their own electricity utilization way of flexibility and interest adjustment behavior to realize the purpose of peak peel and improve the load rate. This paper is on the basis of considering the user satisfaction, using plastic load capacity and power generation side coal saving benefit after two measures of implementing peak valley price demand response potential quantitative analysis, and feasibility of implementing peak valley price for a specific region. At last, a big industrial user in a certain area as an example for analysis, the result shows that the implementation of peak valley price can bring potential benefits, and provide a guide that the feasibility of implementing peak valley price in the region.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1070-1072)

Pages:

1506-1510

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] DING Ning, WU Junji, ZHOU Yun.Research of peak andvalley time period partition approach and TOU price on DSM.Automation of Electric Power System, 2001, 25(23):9-12.

Google Scholar

[2] SHU Hongchun, DONG Jun, WU Shuijun.A Prellminary Discussion on Implementing of Peak-valley and Time-of-use and Season-of-use Price for Different Industries at Demand side.Automation of Electric Power System, 2006, 30(14):36-40.11-26.

Google Scholar

[3] CHENG Xiang-hui, LIU Jun-yong, FENG Han, et. al. ADM analysis of power emergency command center to start based on accident state and tendency grade evaluation[J]. Power System Protection and Control, 2011, 39(16): 45-52.

Google Scholar

[4] ZHANG Qin, WANG Xifan, WANG Jianxue, et al.Decision Model Analysis of Season-of-use Price.Automation of Electric Power System, 2007, 31(24):7-11.

Google Scholar

[5] HUANG Jianbai, HUANG Xiangyu, SHAO Liuguo, et al.Peak and Valley Time Price Model and Simulation Based on System Dynamics Part One Model Establishment.Automation of Electric Power System, 2006, 30(11):18-23.

Google Scholar

[6] HUANG Jianbai, HUANG Xiangyu, SHAO Liuguo, et al.Peak and Valley Time Price Model and Simulation Based on System Dynamics Part Two Model Establishment.Automation of Electric Power System, 2006, 30(11):18-23.

Google Scholar

[7] WANG Mianbin, TAN Zhongfu, ZHANG Rong, et al.Desigen of Time-of-Use Power Price at Generation Side and Optimal Model of Electricity Distribution. Electric Power Automation Equipment, 2007, 27(8):16-20.

Google Scholar