Study on Cascade Energy Storage Operation Chart Optimization of Li Xianjiang Basin Based on Progressive Optimal Algorithm

Article Preview

Abstract:

Based on the cascade reservoirs of Li Xianjiang basin, the study of cascade energy storage operation chart was carried out in this paper. Combining the commonly used discriminant method in joint dispatching of cascade reservoirs, the drawing method of energy storage scheduling figure was described detailedly, especially the calculation process of deriving the typical runoff that corresponds to the up and down basic scheduling lines. Considering the power generation reliability was enhanced when implementing the joint operation for cascade reservoirs, the maximum power generation model based on energy storage operation chart was proposed in this paper, and the progressive search method is used in the solving process of the model in a certain range of guaranteed output. In addition, result of the model was further optimized by using Progressive Optimal Algorithm, and comparing the optimized result with the conventional dispatching scheme under the unchanged guaranteed output, the power generation has increased 0.04 million kWh and assurance rate increased 9%.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1073-1076)

Pages:

1641-1650

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Bingru Ye: Hydraulic calculation and water resources planning(Hydraulic and electric power press, Beijing 1995).

Google Scholar

[2] Changming Ji, Zhiqiang Jiang, Ping Sun, et al. in: Optimization of cascade total output dispatching figure in Li Xianjiang basin, volume 2 of Journal of Hydraulic Engineering, chapter, 45(2014).

Google Scholar

[3] Ming Zhang, Liping Wang, Yougui An, et al. in: Optimizing study on reservoir operation chart , volume 3 of Journal of Wuhan University of Hydraulic and Electric Engineering, chapter, 37(2004).

Google Scholar

[4] Bin Luo, Kaixia Qian, Anqiang Li, et al. in: Study of joint operation scheme of Wujiang River cascade reservoirs, volume 22 of Yangtze River, chapter, 14(2010).

Google Scholar

[5] Chuntian Cheng, Fengying Yang, Xinyu Wu, et al. in: Link the simulation with dynamic programming successive approximations to the study on optimal operation chart of cascade reservoirs , volume 6 of Journal of Hydroelectric Engineering, chapter, 29(2010).

Google Scholar

[6] Jinhua Wen, Liehuan Lu, Jiangbo He, et al. in: Study on Optimal Operation Chart of Cascade Reservoirs Based on Genetic Algorithms, volume 31 of Journal of Anhui Agricultural Sciences, chapter, 39(2011).

Google Scholar

[7] Jiawen Huang, Ying Hu, Huasui Li. In: Model of Joint Optimizing Operation for Cascade Reservoirs and Application, volume 12 of China Water Power & Electrification (2011).

Google Scholar

[8] Ming Zhang, Chengjun Li, Xiaohui Yuan, et al. in: Long-term optimal scheduling of large-scale hydropower systems for energy maximization, volume 3 of Journal of Anhui Agricultural Sciences, chapter, 40(2007).

Google Scholar

[9] Jin Zou, Kezhen Liu: The operation and optimal operation of water resources system (Metallurgic Industry Press, Beijing 2006).

Google Scholar