Finite Element Analysis of Dam Foundation Seepage Effect on Cutoff Wall Depth of Guxue Concrete Gravity Dam

Article Preview

Abstract:

This paper is committed to analyze the results of numerical simulation in the dam foundation seepage field of Guxue concrete gravity dam with the finite element method. The results show that the cutoff wall depth of the Guxue dam foundation seriously impacts the seepage effect of cutoff wall. The cutoff wall initially becomes deeper, the reduction of seepage discharge is distinct to reach 24%, as the depth increases gradually, the seepage discharge reduces slowly and can only reach 7%. In a word, the cutoff wall depth of Guxue concrete gravity dam exists a reasonable value and the numerical result is15m in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1073-1076)

Pages:

1729-1732

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yongzhan Song, Tinghong Zhao, Rui Ding: Lanzhou University of Technology. Vol. 06 (2011), P. 120-125. In Chinese.

Google Scholar

[2] Yunxiao He: Taiyuan University of Technology. 2013, P. 68-72. In Chinese.

Google Scholar

[3] Changxi Mao: China Water Power Press. 2003. P. 13-17. In Chinese.

Google Scholar

[4] Qianfei Zhang: Wuhan University of Hydraulic and Electric. Vol. 33 (2000). In Chinese.

Google Scholar

[5] Junping Hou: Wuhan UniversityVol. 38 (2005), P. 63-66. In Chinese.

Google Scholar

[6] GuiyunZhou: Water Resources and Hydropower Technology progress Vol. 29 (2009), P. 5-8.

Google Scholar

[7] Jingru Wu: Xi'an University of Technology. 2005 .P. 1090-1105. In Chinese.

Google Scholar