Study on Wellbore Deposits Prevention and Removal Process for H Oilfield in Iraq

Article Preview

Abstract:

The crude oil of H oilfield contains wax and asphaltenes, and the formation water salinity is up to 160000-220000mg/l, so there is a tendency that the asphaltenes and scale will be deposited in the wellbore during the course of well production, which will influence the normal production greatly. It is necessary to make clear the sedimentary law and corresponding measures. The content of organic and inorganic of wellbore deposits of H oilfield is analyzed through a series of laboratory tests. On the base of the test results, integrated with comparison of conventional deposit prevention and removal technologies, chemical and mechanical methods are recommended. Moreover, formulation of the acid cleaning agent is determined and the principle and process of mechanical removal method is presented.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1073-1076)

Pages:

2227-2230

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhigang Fang. Research on the Anticorrosion and Antiscale Gas Lift Completion String. [J] China Petroleum Machinery, 2012, 40(10), 72-75.

Google Scholar

[2] Hengmin Pan, Qinghong Sun, etc. Reservoir Precipitates Remove and Prevention in water Injection and Oil Production Wells at Peripheral Oil Fields of Daqing. [J] Oilfield Chemistry, 2005, 22(2), 119-121.

Google Scholar

[3] Jianbing Yin, Huadong Wu, etc. Application of Electronic Scale Remover/Preventer Scalefighter-PDPT in Oil-Gathering System of Qingxi Oil Field, Yumen. [J] Oilfield Chemistry, 2007, 24(3), 210-212, 222.

Google Scholar