Cable Stayed Bridge Avenida Prudente de Morais, Natal, Brazil

Article Preview

Abstract:

The paper deal with the design and construction of cable stayed bridge in the city Natal in Brazil. The bridge has total length of 280m and consists of two approaches and main cable-stayed part with spans of 2x60m. The cable-stayed part is formed by one pylon with two planes of stays. The superstructure of approaches is formed of precast beams and concrete composite deck. Parapet girder has been used for the superstructure design of cable stayed part. The pylon has a ”V” shape because of the plan curvature of the bridge. Strasky, Husty a partneri company has developed the detailed design of the bridge. The bridge construction has finished in June 2014.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

187-190

Citation:

Online since:

June 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. Strasky, Stress Ribbon and Cable-Supported Pedestrian Bridges, second ed., Thomas Telford Publishing, London, (2011).

DOI: 10.1680/srcspb.41462

Google Scholar