A New Technique and its Application in the Conservation of Historical Masonry Constructions - Underpinning by Manual Pipe-Jacking

Article Preview

Abstract:

The structural damages, which result from the inadequate bearing capacity or the asymmetric support of foundation, are one of the crucial works in the conservation of historical masonry constructions. Firstly ,the box girders are slowly and evenly jacked by the manual pipe jacking technique ,and then casting the core beam to form a whole, so the construction is gradually situated on a "tray" with sufficient rigidity. Consequently, the structural damages caused by the inadequate bearing capacity or the asymmetric support of foundation is thoroughly treated. Based on the field test, the principle of the underpinning by manual pipe-jacking , the mutual effect mechanism between box girders and soil, the calculation of jacking force and its influence factors are investigated in detail, and the empirical formula of calculating jacking force is also presented.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 133-134)

Pages:

1077-1082

Citation:

Online since:

October 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] An, G F, Yin, K L, and Tang, H M (2002. ). Discrimination and analysis of formulae for jacking forces in pipejacking., Rock and solid mechanics, 6, 358-361. (in Chinese).

Google Scholar

[2] Gang, L (1997). "Numerical Modelling of Damage to Masonary Buildings Due to Tunnelling. Doctorial thesis to the Oxford University. (in Chinese).

Google Scholar

[3] Gao, N X, and Zhang, X Z (1984). Pipe jacking technology., Beijing: China Architecture & Building Press,. 8, 62-63, 47. (in Chinese).

Google Scholar

[4] Li, J (2006). Ying Zao Fa Shi. " Beijing: People, s Publishing House. (in Chinese).

Google Scholar

[5] National code, Code for construction technology and acceptance of pipe jacking (implementation). (in Chinese).

Google Scholar

[6] Xian, D Z, Wang, T C, and Bian, Z H (2005). New construction technologies of integral lifting of Kunming Jin gang tower., Construction Technology, 8, 17-19. (in Chinese).

Google Scholar

[7] Yan, C W, and Jiang, G S (2005). Laying underground pipeline by Trenchless technology., Shanghai: Shanghai Science and Technology Publishing House. 1, 83-89. (in Chinese).

Google Scholar

[8] Yu, B Q, and Chen, CC (1998). Construction technology of pipe jacking. " People, s Communications Press, 8, 72-84, 187. (in Chinese).

Google Scholar

[9] Zhang, W X, Chen, P, and Zhao, D (2009).

Google Scholar