Digital Integrated Monitoring System of Mine Hoist Based on ARM

Article Preview

Abstract:

The real-time respondent speed and the reliability play a deciding role on the performance of the digital monitoring for mine hoist. Differs to the traditional monitoring for mine hoist , it is possible to improve the signal respondent speed during upgrading of mine hoist by two methods, one is to adopt the quick microprocessor and another is the embedded real-time multi-task operating system. The Advanced Reduced Instruction Set Computer Machines (ARM) is particularly suitable to work as the controller of the digital monitoring for mine hoist with its merits as high running speed and complete peripheral equipments. The micro C/OS-Ⅱcan both improve the respondent speed against various signals from mining enterprises fields and the reliability of the controlling software as an embedded real-time operating system.The principle of task allocation is an important one of the highest priority related to the stability of mine hoist and functional tasks. To avoid multiple tasks simultaneously access the same shared resources, two semaphores are introduced to determine the access mechanism of the shared resource. Application of real-time operating system is the future of digital development of mine hoist.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

200-205

Citation:

Online since:

March 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] K. Johnson: Mining Journal Vol. 334(2000), p.268.

Google Scholar

[2] Mills AP Jr: Mining Technology Vol. 77(1995), pp.167-173.

Google Scholar

[3] J.G. Jiang, Y.L. Zhao, Z.M. Shao. World Mining Equipment Vol. 1(2001), pp.1-6.

Google Scholar

[4] Beus M.J., Ruff T.M., McCoy W.G. Industry Application Conference, 1997. Thirty-Second IAS Annual Meeting, IAS'97, Conference Record of the 1997 IEEE Vol. 3(1997), p.2091-(2097).

DOI: 10.1109/ias.1997.626357

Google Scholar

[5] Z.Z. Liang: The 18th International Conference on Computers&Industrial EngineeRing (ICC&IE'95), Shanghai, China Vol. 2(1995), pp.799-802.

Google Scholar

[6] Johansson: Bergsmannenmed Jernkontorets Annaler (2000), pp.41-42.

Google Scholar

[7] A. Potts: Mining Technology Vol. 77(1995), pp.381-386.

Google Scholar

[8] Z.J. Wang, Y.C. Wang, J. Meng, P.C. Zhao: Journal of China University of Mining and Technology Vol. 15(2005), pp.96-99.

Google Scholar