Material Management System Based on Daily Work

Article Preview

Abstract:

The purpose of this paper is to introduce material management system based on daily schedule management. The backbone is a scheduling system that adopts a production planning system as well as a project scheduling system. The lowest level in the scheduling system is the daily schedule management, which is linked to material management system. The paper focuses on the material management and scheduling systems to implement a material “pull” system for reducing materials inventories on site. Benefits and challenges of material management and scheduling systems are discussed through interview with managers and engineers.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

1587-1591

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Paulson, B. C. (1995): Computers and construction – Midcareer reflections. Journal of Construction Engineering and Management, ASCE, 121(2): 197-200

DOI: 10.1061/(asce)0733-9364(1995)121:2(197)

Google Scholar

[2] Tommelein, I. (1998): Pull-driven Scheduling for Pipe spool installation, Journal of Construction Engineering and Management, ASCE, July/August, 279-288.

DOI: 10.1061/(asce)0733-9364(1998)124:4(279)

Google Scholar

[3] Ballard G., and Kim, Y (2007): Implementing Lean on Capital Projects, 15th Annual Conference of the International Group for Lean Construction, Detroit, MI.

Google Scholar

[4] CII (1988): Project Materials Management Primer, RS47-1. Prepared by the Material management Task Force, Construction Industry Institute, Austin, Texas.

Google Scholar

[5] Lean Construction Institute. Information on http://www.leanconstruction.org

Google Scholar

[6] Kim, Y, Ballard G., and Park, C. (2007): A Case of Lean Implementation: Shift from Lean Production to Lean Supply Chain Management, 15th Annual Conference of the International Group for Lean Construction, Detroit, MI.

DOI: 10.24928/2018/0538

Google Scholar

[7] Howell, G. (1999): What is Lean Construction?, Proceedings of the 7th Annual Conference of the International Group for Lean Construction, Tommelein, I. D. (editor), Berkeley CA, 1-10.

Google Scholar

[8] Arbulu, R., Ballard, G., and Harper, N. (2003): Kanban in Construction Proceedings 11th Conference of the International Group for Lean Construction, Virginia Tech., Blacksburg, VA.

Google Scholar

[9] Ballard, G., Kim, Y., Jang, J., and Liu, M. (2007): Lean Implementation at Project Level, A Research Report to the Construction Industry Institute, Sept.

Google Scholar

[10] Hopp, W. and Spearman, M. (1996): Factory Physics: Foundations of Manufacturing Management. Irwin/McGraw-Hill, Boston, Massachusetts.

Google Scholar

[11] Ballard, G. (1999): Improving Work Flow Reliability, Proceedings 7th Conference of the International Group for Lean Construction, University of California at Berkeley, California, USA, 26-28 July (1999)

Google Scholar

[12] Ballard, G. (1994): The Last Planner, Northern California Construction Institute, Monterey, California

Google Scholar

[13] Ballard, G. and Howell, G. (1998): Shielding Production: An Essential Step in Production Control, Journal of Construction Engineering and Management, ASCE, 124 (1) 11-17

DOI: 10.1061/(asce)0733-9364(1998)124:1(11)

Google Scholar

[14] Ballard, G. (2000): Lean Project Delivery System, White Paper No. 8, Lean Construction Institute, California

Google Scholar

[15] Kim, S. and Park, C. (2007): Creating Total Project Management System on Applying Lean Construction, Proceedings of the ICCEM_ICCPM in 2007, ICCEM_ICCPM, 2007.

Google Scholar