[1]
Paulson, B. C. (1995): Computers and construction – Midcareer reflections. Journal of Construction Engineering and Management, ASCE, 121(2): 197-200
DOI: 10.1061/(asce)0733-9364(1995)121:2(197)
Google Scholar
[2]
Tommelein, I. (1998): Pull-driven Scheduling for Pipe spool installation, Journal of Construction Engineering and Management, ASCE, July/August, 279-288.
DOI: 10.1061/(asce)0733-9364(1998)124:4(279)
Google Scholar
[3]
Ballard G., and Kim, Y (2007): Implementing Lean on Capital Projects, 15th Annual Conference of the International Group for Lean Construction, Detroit, MI.
Google Scholar
[4]
CII (1988): Project Materials Management Primer, RS47-1. Prepared by the Material management Task Force, Construction Industry Institute, Austin, Texas.
Google Scholar
[5]
Lean Construction Institute. Information on http://www.leanconstruction.org
Google Scholar
[6]
Kim, Y, Ballard G., and Park, C. (2007): A Case of Lean Implementation: Shift from Lean Production to Lean Supply Chain Management, 15th Annual Conference of the International Group for Lean Construction, Detroit, MI.
DOI: 10.24928/2018/0538
Google Scholar
[7]
Howell, G. (1999): What is Lean Construction?, Proceedings of the 7th Annual Conference of the International Group for Lean Construction, Tommelein, I. D. (editor), Berkeley CA, 1-10.
Google Scholar
[8]
Arbulu, R., Ballard, G., and Harper, N. (2003): Kanban in Construction Proceedings 11th Conference of the International Group for Lean Construction, Virginia Tech., Blacksburg, VA.
Google Scholar
[9]
Ballard, G., Kim, Y., Jang, J., and Liu, M. (2007): Lean Implementation at Project Level, A Research Report to the Construction Industry Institute, Sept.
Google Scholar
[10]
Hopp, W. and Spearman, M. (1996): Factory Physics: Foundations of Manufacturing Management. Irwin/McGraw-Hill, Boston, Massachusetts.
Google Scholar
[11]
Ballard, G. (1999): Improving Work Flow Reliability, Proceedings 7th Conference of the International Group for Lean Construction, University of California at Berkeley, California, USA, 26-28 July (1999)
Google Scholar
[12]
Ballard, G. (1994): The Last Planner, Northern California Construction Institute, Monterey, California
Google Scholar
[13]
Ballard, G. and Howell, G. (1998): Shielding Production: An Essential Step in Production Control, Journal of Construction Engineering and Management, ASCE, 124 (1) 11-17
DOI: 10.1061/(asce)0733-9364(1998)124:1(11)
Google Scholar
[14]
Ballard, G. (2000): Lean Project Delivery System, White Paper No. 8, Lean Construction Institute, California
Google Scholar
[15]
Kim, S. and Park, C. (2007): Creating Total Project Management System on Applying Lean Construction, Proceedings of the ICCEM_ICCPM in 2007, ICCEM_ICCPM, 2007.
Google Scholar