Research on Operational Risk Management of the Eastern Route of South-to-North Water Transfer Project in China

Article Preview

Abstract:

The South-to-North Water Transfer Project (SNWTP) in China is a considerable trans-basin water transfer project which can relieve the serious water resources shortage in northern of China and optimize water resources allocation. The construction of SNWTP has strategic importance to transfer the water from south to north and realize the target of water resources allocation. The operational management risks of SNWTP are discussed in this paper and the eastern route of SNWTP is studied as a case. The definition and connotation is given on the risk of operational management of SNWTP and the operational risk factors of SNWTP are distinguished. The index system of operational management risks is established. Considering the uncertainty of the risks of SNWTP, the risk evaluation model based on evidence theory is put forward. The countermeasures for the operational management risks of eastern route of SNWTP is brought up from the aspects of establishing risks management organization, risks management platform and emergency mechanism, technical methods and so on.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

2877-2881

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. T.Huang: Risk Management of Public Welfare Water Conservancy Construction Projects: Researches Based on ERM Framework. China Water Resources, 2008, p.51

Google Scholar

[2] H. M.Wang, Z. Y. Hu: Several Issues on South-to-North Water Transfer Project Supply Chain Operations Management. Advances In Water Science 16(6) (2005), p.864

Google Scholar

[3] B.Wang, Y. Q. Zhu: Discussion on Project Governance of Public Welfare Hydraulic Engineering Construction. Advances in Science and Technology of Water Resources vol 26, No.6 (2006), p.76

Google Scholar

[4] M. H.Qing, J. J.Xu, X. Liu: The Identification and Control of Risks of Eastern Route of South-to-North Water Transfer Project. Journal of Hohai University, vol 6, no.3(2004), p.29

Google Scholar

[5] A. Tchmaova, J. Dezert, T. Semerdjiev, P. Konstantinova: Target Tracking with Generalized Data Association Based on the General DSm Rule of Combination. Proceedings of Fusion ( 2004),Stockholm,Sweden,June28th-July1th

Google Scholar

[6] X. Liu, Y.Q. Han: Custom Credit Assessment Based on D-S Evidential Reasoning. Operational Research and management Science, vol 14, no.4(2005), p.115

Google Scholar

[7] H.Wang, D. Y. Qing , J. H.Wang: Concept of System and Methodology for River Basin Water Resources Programming. Journal of Hydraulics Engineering, 2002, p.1

Google Scholar