The Construction Technology of Light Masonry Retaining Structure Used in Fluctuating Belt of the Three Gorges Reservoir Area

Article Preview

Abstract:

Masonry retaining structure consists of precast concrete blocks, which has good looks and is in harmony with environment. Blocks with proper shape can be used in fluctuating belt of the reservoir area. The construction of masonry structure should conform to the following steps: first, excavate the foundation ditch, lay a cushion and arrange the controlling points, insuring the quality of the first layer of blocks; it would be better to choose inorganic coarse-grained soil as filler and to set a water filtering layer with a height more than 30cm behind the retaining wall; carry on the construction of earth filling behind the wall after the blocks are fixed as requested, and then fix the geotechnical grille when the height of earth filling reaches the elevation of the grille; put Geotechnical Fabric between permeable aggregate and the earth filling behind it to keep the two materials from mixing.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

602-606

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Cheng Longfei, Yi zhongjiu. Study on Green bank-maintaining structure used in fluctuating belt of the Three Gorges Reservoir area. Chinese Association of Science and Technology Annual Conference Symposium——The seventh sub-forum. Chongqing, (2009)

Google Scholar

[2] Cheng Longfei, Sun Shulin, Pei Hongjun. Analysis of the principle of Vetiver-hinged concrete blocks bank-maitaining system.Chinese journal of geotechnical engineering.Vol.27(2005), pp.562-566,in Chinese.

Google Scholar

[3] Cheng Longfei, Cheng Weiguo, Jiang Zhiqiang. A new type of inter-locking blocks slope-maintaining system. Water Resources and Hydropower Engineering. Vol.11 (2005),pp.65-66,in Chinese.

Google Scholar

[4] Cheng Longfei. Design and application of dried barrier reinforced landscape retaining structure ,Technology of Suzhou. Vol.11 (2005) ,in Chinese.

Google Scholar

[5] Cheng Longfei. Study on the key sizing techniques applied in landscape blocks of diamond-shaped series. China Concrete and Cement Products.2009(1), pp.61-64,in Chinese.

Google Scholar

[6] Cheng Longfei. Numerical simulation and shape study of masonry reinforced retaining structure. Shanxi Achitecture. Vol. 30(2009) pp.1-2,in Chinese.

Google Scholar

[7] Shanxi Communications Department. Technical code for construction of highway reinforced earth engineering.China Communications Press, Beijing.Vol.2(1992)

Google Scholar