Asymmetric Construction Technology of Partially Cable-Stayed Bridge with Single Tower and Single Cable Plane

Article Preview

Abstract:

According to the structural characteristics and the surrounding environment of partially cable-stayed bridge, an asymmetric construction method combinded with support cast-in-place and cantilever casting is applied for main girder construction, based on project of Yuyao cable-stayed bridge. Its basic idea is as follows: One deck section is concreted with brackets in advance, which to offer counterweight for basket construction symmetrically. The technical features and construction key point are described in detail, which provides reference for similar bridge construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

881-885

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen Mingxian. Cable-Stayed Bridge Construction Technology [M]. Beijing:China Communication Press, 2003.

Google Scholar

[2] Xu Wei. Bridges Construction[M]. Beijing:China Communication Press, 2008.

Google Scholar

[3] Cui Xuemin, Nie Guilan, Wang Xin. The Application of Rhombic Cantilever Hanging Basket Construction in Long-span Bridge[J]. Science and Technology of West China, 2009,08(14):27-30.

Google Scholar

[4] Zhang Peng, et. al. Design and Construction of Assembly Continuous Beam Bridge [J]. Journal of Water Resources and Architectural Engineering, 2006(03)

Google Scholar

[5] Yao Lingsen. Bridge Engineering[M]. Beijing:China Communication Press, 2009.

Google Scholar