Study on Application of Extrusion Concrete Side Wall in Concrete Face Rock Fill Dam

Article Preview

Abstract:

Compared with the traditional upstream dam slope construction method, the extrusion side wall technology has many advantages. such as less process steps, little interference, quick construction speed etc ,So it arouse more and more attention in the engineer design and construction fields . The technology of extrusion concrete side wall applied to the construction of concrete face rockfill dam in the Bailian river storage power station, machinery and equipment were used on the cushion material to form a concrete wall extrusion , which avoid the traditional process of Ultra-filled cushion material, rolling slopes, cut slopes and other complicated process, not only ensure the quality, but also improve the stress state of the panel.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 287-290)

Pages:

3002-3006

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hong-tian Cheng, Deng-yu Xiong , Dan-di Wang. Concrete face rockfill dam extrusion wall technology overview.[J].Northwest Hydropower. 2009,No.5 :21- 24

Google Scholar

[2] Hao-qin Huang. Bailian River the main dam concrete sidewall power construction technology economic analysis.Yangtze River,2007, Vol.38, No.3 : 22-23

Google Scholar

[3] Yu-feng lv ,Qingyu-Zhou. The effect of the construction method of extrusion side wall on the panel stress. Northeast Water Conservancy and Hydropower ,2007, No. 8-10.

Google Scholar

[4] Xian-qi Luo, Xiao-ming Wu ,Fuguo-Tong. Study of Shuibuya CFRD stress-strain based on extrusion side wall technology .[J]. Chinese Journal Rock Mechanics and Engineering ,Vol.24, No.13: 2342-2349

Google Scholar

[5] Jia-zheng Pan, Preface [A].China Concrete Face Rockfill Dam in 20years. [C]. China waterpower press, 2005 Beijing.

Google Scholar

[6] Jin-ke Ren and Zheng-yue Xu. level 2 Longshou hydropower station construction key technology. Water Conservancy and Hydropower Technology.2005.No.2:55- 57

Google Scholar

[7] Yu-jun Sun, Di-Hong ,Xuan-Zheng Wu. Gongboxia CFRD concrete extrusion type sidewall technology application. [J]. water power ,2002(8) :45-47.

Google Scholar

[8] Guo-hua Weng.CFRD panel crack causes and prevention measures [J]. Water Conservancy Science and Technology & Economy ,2009,Vol.15, No.2 : 174-175.

Google Scholar

[9] Zhong-ru Wu. The hydraulic structures safety monitoring theory and its application [M] . Higher education press, Beijing ,2003:1-3

Google Scholar

[10] Fu-xing Yu.Extrusion concrete side-wall construction technology in the CFRD of application. [J]. Large Dam & Safety. 2009(3): 64-67.

Google Scholar