Genetic Analysis and Repair of Cracks in Prestressed Concrete Box Girders during Precast Period

Article Preview

Abstract:

During the initial period of precast prestressed concrete box girders in a bridge, some cracks appeared in five box girders. The paper describes the crack states including location, elongation, space, width and depth. The geneses of the cracks are analyzed considering the concrete proportion, environmental condition and construction procedure. Four of them were permitted to be used after mending of these cracks and another one was abandoned directly. After the preventing measurement was adopted, no cracks appeared in the follow-up precast box girders. The experience can be as reference for the similar construction works.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

55-58

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G. Zhao and S. Li: Crack Control of Reinforced Concrete Structures (Maritime Press, Beijing, 1991), in Chinese.

Google Scholar

[2] S. Zhao: Design Principles of Concrete Structures (Tongji University Press, Shanghai, 2004), in Chinese.

Google Scholar

[3] X. Li, S. Zhao and S. Pei: Harbor Technology, No. 3 (2005), pp.25-26, in Chinese.

Google Scholar

[4] GB50376-2006: Design Code for Strengthening Concrete Structures (China Building Industry Press, Beijing, 2006), in Chinese.

Google Scholar

[5] S. Zhao: Tests for Engineering Structures (Yellow River Conservancy Press, Zhengzhou, China 2001), in Chinese.

Google Scholar