Analysis of Construction Risk Control Project for Shaft Close to Current Iron Tower

Abstract:

Article Preview

Though engineering compares and numerical analysis, the analysis of construction risk control project for shaft close to current iron tower is carried on, which relies on the engineering of electric cable sending-out of 110kv transformer substation in XiGuan Intersections, the city of LanZhou (the section of underground excavation in the west of LeiTan river).The result shows that the method of isolated steel pipe and grouting technique applied for stratum consolidation can effectively control the iron tower’s deformation and decrease the construction risk.

Info:

Periodical:

Advanced Materials Research (Volumes 368-373)

Edited by:

Qing Yang, Li Hua Zhu, Jing Jing He, Zeng Feng Yan and Rui Ren

Pages:

2264-2267

DOI:

10.4028/www.scientific.net/AMR.368-373.2264

Citation:

H. S. Bo and H. K. Liu, "Analysis of Construction Risk Control Project for Shaft Close to Current Iron Tower", Advanced Materials Research, Vols. 368-373, pp. 2264-2267, 2012

Online since:

October 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.