Controlled Blasting for Subgrade Near Bridge Abutment

Article Preview

Abstract:

The subgrade at the end of a bridge near some important buildings,such as bridge abutment and 500KV transmission line. To meet of the demand of construction period, Different technique of blasting benches were adopted in different district. And meanwhile,safety control was also strengthened in the blasting operation. The blasting successfully made the bridge abutment and the fly-rock under control.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 368-373)

Pages:

2787-2790

Citation:

Online since:

October 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Qizhong, the blasting safety and regulations standard editing. Beijing: Standards Press of China, 1994(In Chinese).

Google Scholar

[2] Liu Dianzhong, blasting the practical manual [M]. Beijing: Metallurgical Industry Press, (1999)

Google Scholar

[3] Zhong Dongwang, Lin Daze, blasting safety technology. Wuhan: Wuhan industrial university press, 1992(In Chinese).

Google Scholar

[4] He Guangyi, the new technology of blasting [M]. Beijing: China Railway Publishing House, 2000. (In Chinese).

Google Scholar

[5] Lu Pengcheng, the application of explosive technique on the handling of broken pile, EAST CHINA HIGHWAY, 2000( 2) : 37~ 38(In Chinese).

Google Scholar

[6] Yang Xuexiang, Li Yan, Underwater Blasting of the Anti-seep Wall of Cofferdam, Blasting,2004(01) (In Chinese).

Google Scholar