A New Real-Time Gas Well Productivity Evaluating Method

Abstract:

Article Preview

With the continuous development, the gas well productivity will decrease. The deliverability test can be used to evaluate gas well productivity, but this method always needs long test which will affect daily production seriously, especially for low permeability gas wells, also there always isn’t enough data in the field. Aiming at this problem, this article presents a new real time method to get the gas well productivity. This new method avoids deliverability test and only needs daily production and wellhead pressure data, so the analysis process is easy and this method has strong practicality. It is proved that this new method works well in the field case.

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Edited by:

Wu Fan

Pages:

5257-5263

DOI:

10.4028/www.scientific.net/AMR.383-390.5257

Citation:

L. Tian et al., "A New Real-Time Gas Well Productivity Evaluating Method", Advanced Materials Research, Vols. 383-390, pp. 5257-5263, 2012

Online since:

November 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.