Expected Model for Time-Energy Trade-Off Problem of Product Disassembly

Abstract:

Article Preview

In the actual disassembly decision-making, people may concern multiple evaluation parameters, such as disassembly time and disassembly energy. In order to deal with multiple parameters evaluation problem, the expected model of time-energy trade-off problem of product disassembly process is presented in this paper. Simultaneously, taking the typical transmission device for example, its stochastic time-energy trade-off problem is analyzed. The results provide guidance for disassembly practice.

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Edited by:

Wu Fan

Pages:

7663-7668

DOI:

10.4028/www.scientific.net/AMR.383-390.7663

Citation:

G. D. Tian et al., "Expected Model for Time-Energy Trade-Off Problem of Product Disassembly", Advanced Materials Research, Vols. 383-390, pp. 7663-7668, 2012

Online since:

November 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.