p.149
p.153
p.157
p.161
p.166
p.170
p.175
p.180
p.184
Mechanical Equipment Coordination and Operation Mode of Wuhan-Guangzhou Passenger Dedicated Line Large Cross-Section Tunnel Construction
Abstract:
studies were carried out to determine the principles of mechanical equipment coordination for large cross-section tunnel construction in combination with the tunnel construction practices within the sections under the charge of China Railway First Group Co., Ltd. on Wuhan-Guangzhou PDL and with a view to optimize the allocation of resources and improve the efficiency of large cross-section tunnel construction. Directed to different procedures such as excavation, support, waterproofing, drainage and lining, the mechanical equipment coordination and operation mode of large cross-section tunnels on the passenger dedicated line were established and the mechanized working faces were formed, which provide experience and reference for the large cross-section tunnel construction of passenger dedicated lines.
Info:
Periodical:
Pages:
166-169
Citation:
Online since:
November 2011
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: