Analysis of Risk Transmission from Generation Right Trading to Generation Company Profit

Article Preview

Abstract:

With the booming of generation right trade(GRT) market, the GRT risk will exert an increasingly important impact on profit of power plants. Hence, Two conditional value at risk (CVaR) models are built for generation rights sellers and buyers respectively. Then, different proportion constraints are set to discuss the influence of GRT. A conclusion can be drawn that the variances of the ratio of generation right power amount may lead to different amount of distribution in different markets as well as the changes of the efficient frontier curves.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 403-408)

Pages:

2856-2860

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Canbin, Kang Chongqing, etc. generation rights trade and its mechanism. Automation of Electric Power Systems. 2003, 27(6): 13-18.

Google Scholar

[2] Shang Jincheng. Generation Right Exchange Theory and Its Applications Based on Energy saving and Emission reducing, Part One Generation Right Exchange Theory. Automation of Electric Power Systems. 2009, 33(12): 46-52.

Google Scholar

[3] XU Rong, ZHAO Yan etc. Profits Analysis of Generation Right Transaction Based on Energy Consumption Saving. Water Resources and Power. 2007, 25(6): 150-153.

Google Scholar

[4] Chen Zhigang , Liu Ruiyu etc. Study on Optimal Generation Right Exchange Mechanism Based on Energy Saving and Emission Reduction. Technology Economics. June, 2010, 29(6): 35-39.

Google Scholar

[5] LIU Jia-jia, LIU Jun-yong. Application of CVaR Models in the Single-period Generation Rights Trade. Journal of Sichuan University(Engineering Science Edition) . 2007, 39(1): 160-165.

Google Scholar

[6] Chen Qi-xin, Kang Chong-qing etc. Generation Rights Trade Model and Its Network Flow Algorithm Considering Congestion Management. Proceedings of the CSEE. 2008, 28(34): 106-111.

Google Scholar

[7] Wang Ren, Shang Jincheng etc. Combined Bidding Strategy and Model for Por Suppliers Based on CVaR Risk Measurement Techiques. Automation of Electric Power Systems. 2005, 29(14): 5-9.

Google Scholar