Key Technology of Construction Control of the Middle Pylon of Taizhou Bridge

Article Preview

Abstract:

The Taizhou Yangtze river bridge is a suspension bridge with three pylons and two 1080m long navigation spans. The middle pylon with height 191.5m is made of steel. The general construction procedure of the middle steel pylon is briefly introduced. Construction control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage besides the installation stage. The manufacturing alignment errors are strictly controlled in precast process of the segments in factory, and the alignment error is identified and predicted precisely during the installation stage. The adjusting joints are adopted to adjust the accumulated errors, which ensure that the steel pylon alignment could satisfy the as-built precision requirements.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1138-1143

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Bin Shen. Bridge Construction(in Chinese), No.4, 2007.

Google Scholar

[2] Jun-ping LI, Yi LI, Yu-hai CHENG. Bridge Construction(in Chinese), No.2, 2006.

Google Scholar

[3] Chengbin Luo, Jianlin Zhou, Wei Tian, Jie Dai. Engineering Sciences, Vol.7 No.1 Mar 2009.

Google Scholar